My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DOC011112
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-10-01 Design and Construction of Canopy at Heritage
>
Specifications
>
DOC011112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2012 8:12:35 PM
Creation date
1/11/2012 11:29:19 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Canopy at Heritage Park
Bid No. (xx-xx-xx)
11-10-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sv11NY S4 <br />s <br />a � <br />� n <br />T 99 <br />y� )* F'LO?y, 5F <br />C /rY OF SUN P \O <br />Addendum No. 5 <br />CITY OF SUNNY ISLES BEACH <br />Design and Construction of Canopy Structures at Heritage Park and <br />Golden Shores Park <br />CITY RFP NO. 11 -10 -01 <br />To All Bidders: <br />Bidders for the above - referenced project shall take note of the following changes, <br />additions, deletions, clarifications, etc. to the Plans and Specifications, which in <br />accordance with the Contract Documents shall become a part of and have precedence <br />over anything shown or described otherwise. <br />➢ The Documentation attached and written below includes Coastal Construction's <br />vendor information based on their vendor warranty submittals. Also attached are <br />some of the as -built information for use. This as -built information does not <br />necessarily include all the information that could be available directly through <br />each of Coastal Construction's vendors listed in the attached warranties. <br />Each prospective bidder should note that there are electrical lines, stormwater <br />lines, sanitary sewer lines, and water lines that are located within the area where <br />the canopies are proposed. They will also be required to ensure that all costs to <br />line adjustments and /or relocations are considered as part of their proposals as <br />per the RFP. <br />Additional information is as follows: <br />General Contractor - COASTAL CONSTRUCTION COMPANY <br />305 - 559 -4900 <br />Engineer of Record /Architect of Record — AECOM /Spillis Candela <br />305 - 444 -4691 (off) <br />END OF SECTION <br />
The URL can be used to link to this page
Your browser does not support the video tag.