My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Zurqui
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-10-01 Design and Construction of Canopy at Heritage
>
Responses
>
Zurqui
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2012 11:24:30 AM
Creation date
1/11/2012 3:05:01 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Canopy at Heritage Park
Bid No. (xx-xx-xx)
11-10-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ZURQUI <br />Construction Services, Inc PHONE &FAX PROJECT MANAGER I EMAIL <br />+ 305- 221 -6100 Eddy Gonzales Jr <br />+305- 221 -6110 Eddy @zurquis.com <br />Approach /Methodology <br />Zurqui Construction Services, 'nc, proposes the following approach methodology to successfully <br />complete the services requested in this solicitation. <br />Phase 1: Due Diligence Review / Conceptual Submittal <br />We propose to obtain and revie ,( existingA s -Built plan s.Reviewexistingprcject plans and visit existing <br />facilities. Review and coordina teas- builtand existingplans to identifylimitations, conflicts, possibilities <br />available to inform revised documents. Perform comprehensive Quality Control Reviews, and re- <br />emphasize project objectives, needs, and program requirements, if needed. Perform comprehensive <br />code compliance reviews of the following: <br />Florida Building Code dates: edition) <br />ADA Accessibility Code (latest edition <br />0 National Fire Protection Code (latest edition) <br />National Electrical Code (latest edition) <br />Phase 2: Owner Review and Coordination <br />O nerReview and Coordination with Design Team K' /E, and 5C4c Submittal of As -3uil: plans. Condur. <br />K%, and 501* review and coordination meeting upon completion of revised plans and specifications. <br />incorporate comments into plans and specifications prior to Building Department submittal. <br />Phase 3: 04;rner Review and Coordination (Continued) <br />O. -.mer Revievr and Coordination . -.,i-.h Design Build Team of 909 Submittal. Concluct9C /i review and <br />coordination meetingupon completion of revised plans and specifications. incorporate comments into <br />plans and specifications prior to Building Oepar :ment submittal. <br />Phase 4: Permit Review Submittal <br />Commence Building Depar :mentsubmittal documentation forpermit review and issuance. incorporate <br />comments into plans and specifications., if necessary. <br />Phase 5: Construction and Completion Support Services <br />Upon Notification to Proceed, the Contractor will submit an initial project Schedule, and an initial <br />Construction Schedule. Review, comment, and recommend these schedules alv.,ays looking -,o ensure <br />project goals and objectives are accounted for within these quantifiable, measured schedules. <br />Periodically review progress of the Workte ascertain qualitycempliance : vith contract requiremen ,s and <br />construction clocuments.When the workis deemedready, establish the date of SubstantialCcmple ion, <br />and prepare a project completion notice. When the :cork is deemed completed, establish the clate of <br />Final Completion. Provide Warranty Support information services during contract warranty, period. <br />
The URL can be used to link to this page
Your browser does not support the video tag.