Laserfiche WebLink
Westside Collins Avenue Sidewalk from 174 In -175 In Tern <br />Concrete Sidewalk <br />FDOT Standard <br />LF of full width <br />Demolition /Hauling <br />Specs. <br />sidewalk <br />$ <br />�d d� <br />251 U. <br />' Z G S, C-0 <br />New Sidewalk - <br />FDOT Standard <br />Concrete Pavers on <br />Specs. <br />LF of full width <br />$ <br />251 U. <br />Sand and concrete as <br />sidewalk <br />1 � <br />necessary - other items <br />Concrete Color Patch <br />Per <br />�5 <br />and Concrete <br />manufacturer <br />LS <br />$ <br />restoration" <br />secs. <br />Mobilization <br />101 <br />LS <br />$ c ��� <br />, <br />O ®6+ 0,6 <br />Maintenance of Traffic <br />102 <br />LS <br />$� G <br />9 aDv * v? <br />Westside Collins Avenue Sidewalk from 175 Terr. - 78 th <br />Concrete Sidewalk <br />FDOT Standard <br />LF of full width <br />Demolition /Hauling <br />Specs. <br />sidewalk <br />$ �- �� <br />d <br />10531.f. <br />�6 <br />New Sidewalk - <br />FDOT Standard <br />Concrete Pavers on <br />Specs. <br />LF of full width <br />$ <br />1053 U. <br />Sand and concrete as <br />sidewalk <br />16, <br />%/ <br />necessary -- other items <br />Concrete Color Patch <br />Per <br />and Concrete <br />** <br />manufacturer <br />LS <br />$ <br />restoration <br />specs.�� <br />Mobilization <br />FDOT 101 <br />LS <br />$ <br />Maintenance of Traffic <br />FDOT 102 <br />LS <br />$ <br />PROJECT TOTAL <br />$ 2 Z 2:2-- <br />NOTES: <br />* The Florida Department of Transportation Standard Specifications for Road and Bridge Construction latest version shall be used <br />for all aspects of this job. <br />* *Color Patch Product: For the base Bid, Contractor shall include the price of the installation and application of the Color Patch <br />Product on a "per location" Lump Sum basis (each location in bold as depicted in the heading). For Add Alternate #1, the Contractor <br />shall provide a price for the rest of the existing paver areas which includes ALL remain blocks COMBINED. Work shall include but <br />shall not be limited to work related to the surface cleaning, preparation, crack filling, surface smoothing, edge leveling, site <br />protection, mobilization, labor, material, and equipment, and other as required to complete the task as per City requirements and <br />manufacturer's recommendations. <br />The cost per items and lump sums listed in the Proposal form shall include the total cost to complete the Work including but not <br />limited to materials, labor, equipment, bonds, off -duty police officers, flag -men, permit application preparation, permitting, permit <br />running, work required to accomplish the construction, coordination costs, and field verification, and others as necessary, and as <br />indicated in the drawings and as intended under this RFP, specifications, addenda, MANDATORY pre - Proposal information and <br />discussions, and any other documents provided to the Contractor by the City to ensure a 100% complete job. <br />These are approximate quantities as developed by the City of Sunny Isles Beach Public Works department. They are generally <br />representative of the work that will be required by the Contractor. CONTRACTOR shall ensure that ALL work for the construction of <br />the proposed roadway improvements is completed within the TOTAL price submitted on this Proposal Form unless it can be proven <br />and agreed in writing by the City that additional work was provided. <br />* * ** Contractor shall ensure that work already completed comply with the requirements of the permit. <br />