NOTES for Add Alternates: <br />The Florida Department of Transportation Standard Specifications for Road and Bridge Construction latest version shall be used <br />for all aspects of this job. <br />'"Color Patch Product: For the base Bid, Contractor shall include the price of the installation and application of the Color Patch <br />Product on a Lump Sum basis. For Add Alternate #1, the Contractor shall provide a price for the rest of the existing paver areas <br />which includes ALL remain blocks COMBINED. Work shall include but shalt not be limited to work related to the surface cleaning, <br />preparation, crack filling, surface smoothing, edge leveling, site protection, mobilization, labor, material, and equipment, and other <br />as required to complete the task as per City requirements and manufacturer's recommendations. The intent of the RFP is to ensure <br />that the total sidewalk project is completed along the entire length of westside sidewalk along Collins Avenue. <br />The cost per items and lump sums listed in the Proposal form shall include the total cost to complete the Work including but not <br />limited to materials, labor, equipment, bonds, off -duty police officers, flag -men, permit application preparation, permitting, permit <br />running, work required to accomplish the construction, coordination costs, and field verification, and others as necessary, and as <br />indicated in the drawings and as intended under this RFP, specifications, addenda, MANDATORY pre-Proposal information and <br />discussions, and any other documents provided to the Contractor by the City to ensure a 100% complete job. <br />These are approximate quantities as developed by the City of Sunny Isles Beach Public Works department. They are generally <br />representative of the work that will be required by the Contractor. CONTRACTOR shall ensure that ALL work for the construction of <br />the proposed roadway improvements is completed within the TOTAL price submitted on this Proposal Form unless it can be proven <br />and agreed in writing by the City that additional work was provided. <br />WE <br />Per <br />Per Tree <br />Installation of one florida <br />Specifications <br />(palms to <br />No. 1 Royal Palm at <br />back <br />have equal <br />$ <br />1 <br />location along the of <br />C.W. with <br />1/a a d� <br />1 <br />sidewalk (At Navarro— <br />other palms <br />I� <br />I 6l` <br />same size) <br />on Collins <br />Removal of trees at 172 —174 North of Town Center Park adjacent to the Winston Tower 600 masonry wall <br />Removal of 4 " -6" diameter <br />caliper (including roots) <br />Per Tree <br />$ �°�jt� <br />3 <br />L�, 0) <br />Removal of 6.1" — 8" <br />diameter caliper (including <br />Per Tree <br />$ <br />roots) <br />Installation of Irrigation as <br />designed and permitted by <br />the Contractor <br />LS <br />$ <br />- 000, O <br />Installation of City of North <br />Miami Beach water meter <br />sized and coordinated and <br />LS <br />$ <br />applied for by Contractor <br />Swo D <br />0 <br />(permit required) <br />ld <br />FPL Service Drops as <br />required to be coordinated <br />LS <br />$ <br />and completed by <br />Contractor at each location <br />Installation of uplights (2 <br />per palm tree) -- see <br />LS <br />$ <br />C a <br />Q r d <br />specifications for u li hts <br />Electrical installation <br />including "unistrut" with <br />electrical components as <br />LS <br />$ r�? <br />Yj <br />�r��o <br />designed by the Contractor <br />t <br />and accepted b the City <br />Mobilization <br />FDOT 101 <br />LS <br />$ <br />Maintenance of Traffic <br />FDOT 102 <br />LS <br />$ <br />per <br />> c� <br />Add Alternate #2 TOTAL <br />Is o 72S <br />NOTES for Add Alternates: <br />The Florida Department of Transportation Standard Specifications for Road and Bridge Construction latest version shall be used <br />for all aspects of this job. <br />'"Color Patch Product: For the base Bid, Contractor shall include the price of the installation and application of the Color Patch <br />Product on a Lump Sum basis. For Add Alternate #1, the Contractor shall provide a price for the rest of the existing paver areas <br />which includes ALL remain blocks COMBINED. Work shall include but shalt not be limited to work related to the surface cleaning, <br />preparation, crack filling, surface smoothing, edge leveling, site protection, mobilization, labor, material, and equipment, and other <br />as required to complete the task as per City requirements and manufacturer's recommendations. The intent of the RFP is to ensure <br />that the total sidewalk project is completed along the entire length of westside sidewalk along Collins Avenue. <br />The cost per items and lump sums listed in the Proposal form shall include the total cost to complete the Work including but not <br />limited to materials, labor, equipment, bonds, off -duty police officers, flag -men, permit application preparation, permitting, permit <br />running, work required to accomplish the construction, coordination costs, and field verification, and others as necessary, and as <br />indicated in the drawings and as intended under this RFP, specifications, addenda, MANDATORY pre-Proposal information and <br />discussions, and any other documents provided to the Contractor by the City to ensure a 100% complete job. <br />These are approximate quantities as developed by the City of Sunny Isles Beach Public Works department. They are generally <br />representative of the work that will be required by the Contractor. CONTRACTOR shall ensure that ALL work for the construction of <br />the proposed roadway improvements is completed within the TOTAL price submitted on this Proposal Form unless it can be proven <br />and agreed in writing by the City that additional work was provided. <br />WE <br />