NOTES for Add Alternates:
<br />The Florida Department of Transportation Standard Specifications for Road and Bridge Construction latest version shall be used
<br />for all aspects of this job.
<br />'"Color Patch Product: For the base Bid, Contractor shall include the price of the installation and application of the Color Patch
<br />Product on a Lump Sum basis. For Add Alternate #1, the Contractor shall provide a price for the rest of the existing paver areas
<br />which includes ALL remain blocks COMBINED. Work shall include but shalt not be limited to work related to the surface cleaning,
<br />preparation, crack filling, surface smoothing, edge leveling, site protection, mobilization, labor, material, and equipment, and other
<br />as required to complete the task as per City requirements and manufacturer's recommendations. The intent of the RFP is to ensure
<br />that the total sidewalk project is completed along the entire length of westside sidewalk along Collins Avenue.
<br />The cost per items and lump sums listed in the Proposal form shall include the total cost to complete the Work including but not
<br />limited to materials, labor, equipment, bonds, off -duty police officers, flag -men, permit application preparation, permitting, permit
<br />running, work required to accomplish the construction, coordination costs, and field verification, and others as necessary, and as
<br />indicated in the drawings and as intended under this RFP, specifications, addenda, MANDATORY pre-Proposal information and
<br />discussions, and any other documents provided to the Contractor by the City to ensure a 100% complete job.
<br />These are approximate quantities as developed by the City of Sunny Isles Beach Public Works department. They are generally
<br />representative of the work that will be required by the Contractor. CONTRACTOR shall ensure that ALL work for the construction of
<br />the proposed roadway improvements is completed within the TOTAL price submitted on this Proposal Form unless it can be proven
<br />and agreed in writing by the City that additional work was provided.
<br />WE
<br />Per
<br />Per Tree
<br />Installation of one florida
<br />Specifications
<br />(palms to
<br />No. 1 Royal Palm at
<br />back
<br />have equal
<br />$
<br />1
<br />location along the of
<br />C.W. with
<br />1/a a d�
<br />1
<br />sidewalk (At Navarro—
<br />other palms
<br />I�
<br />I 6l`
<br />same size)
<br />on Collins
<br />Removal of trees at 172 —174 North of Town Center Park adjacent to the Winston Tower 600 masonry wall
<br />Removal of 4 " -6" diameter
<br />caliper (including roots)
<br />Per Tree
<br />$ �°�jt�
<br />3
<br />L�, 0)
<br />Removal of 6.1" — 8"
<br />diameter caliper (including
<br />Per Tree
<br />$
<br />roots)
<br />Installation of Irrigation as
<br />designed and permitted by
<br />the Contractor
<br />LS
<br />$
<br />- 000, O
<br />Installation of City of North
<br />Miami Beach water meter
<br />sized and coordinated and
<br />LS
<br />$
<br />applied for by Contractor
<br />Swo D
<br />0
<br />(permit required)
<br />ld
<br />FPL Service Drops as
<br />required to be coordinated
<br />LS
<br />$
<br />and completed by
<br />Contractor at each location
<br />Installation of uplights (2
<br />per palm tree) -- see
<br />LS
<br />$
<br />C a
<br />Q r d
<br />specifications for u li hts
<br />Electrical installation
<br />including "unistrut" with
<br />electrical components as
<br />LS
<br />$ r�?
<br />Yj
<br />�r��o
<br />designed by the Contractor
<br />t
<br />and accepted b the City
<br />Mobilization
<br />FDOT 101
<br />LS
<br />$
<br />Maintenance of Traffic
<br />FDOT 102
<br />LS
<br />$
<br />per
<br />> c�
<br />Add Alternate #2 TOTAL
<br />Is o 72S
<br />NOTES for Add Alternates:
<br />The Florida Department of Transportation Standard Specifications for Road and Bridge Construction latest version shall be used
<br />for all aspects of this job.
<br />'"Color Patch Product: For the base Bid, Contractor shall include the price of the installation and application of the Color Patch
<br />Product on a Lump Sum basis. For Add Alternate #1, the Contractor shall provide a price for the rest of the existing paver areas
<br />which includes ALL remain blocks COMBINED. Work shall include but shalt not be limited to work related to the surface cleaning,
<br />preparation, crack filling, surface smoothing, edge leveling, site protection, mobilization, labor, material, and equipment, and other
<br />as required to complete the task as per City requirements and manufacturer's recommendations. The intent of the RFP is to ensure
<br />that the total sidewalk project is completed along the entire length of westside sidewalk along Collins Avenue.
<br />The cost per items and lump sums listed in the Proposal form shall include the total cost to complete the Work including but not
<br />limited to materials, labor, equipment, bonds, off -duty police officers, flag -men, permit application preparation, permitting, permit
<br />running, work required to accomplish the construction, coordination costs, and field verification, and others as necessary, and as
<br />indicated in the drawings and as intended under this RFP, specifications, addenda, MANDATORY pre-Proposal information and
<br />discussions, and any other documents provided to the Contractor by the City to ensure a 100% complete job.
<br />These are approximate quantities as developed by the City of Sunny Isles Beach Public Works department. They are generally
<br />representative of the work that will be required by the Contractor. CONTRACTOR shall ensure that ALL work for the construction of
<br />the proposed roadway improvements is completed within the TOTAL price submitted on this Proposal Form unless it can be proven
<br />and agreed in writing by the City that additional work was provided.
<br />WE