My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Williams Paving Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-11-03 Collins Avenue Streetscape
>
Responses
>
Williams Paving Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2012 12:59:30 PM
Creation date
1/11/2012 4:05:10 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
CollinsAve. Streetscape
Bid No. (xx-xx-xx)
11-11-03
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUALIFICATIONS <br />LAWRENCE COLLINS <br />Vice President Operations /Project Director <br />Lawrence "Lonnie" Collins has been involved in the <br />in engineering construction industry of South <br />Florida since 1969. He has worked in every facet of <br />the industry and possesses extensive technical <br />knowledge. Prior to joining WPC Lonnie was the <br />owner of C & S Paving Company, inc., a engineering <br />contractor where he performed over $40M in <br />projects. He has been with Williams Paving Co., Inc. <br />Since 1995 and has been instrumental in the <br />company's growth and success as one of South <br />Florida's leading construction firms. <br />RECENT PROJECT EXPERIENCE <br />• NW 138"' Street Reconstruction, City of Hialeah <br />$12.7M — 1.25 MI of roadway reconstruction, <br />including canal relocation, underground utilities, <br />base, asphalt, concrete curbs and sidewalk, <br />lighting and signal <br />NW 15th Avenue Reconstruction, Miami -Dade <br />County $7.8M — roadway widening and <br />reconstruction NE 159th Street to NE 186th Street <br />including bridge widening, underground <br />utilities, base, asphalt, concrete curbs and <br />sidewalk, lighting and signal <br />• NW 97th Avenue Construction, City of Hialeah <br />$8.5M — 1.25 MI of new roadway construction <br />including underground utilities, base, asphalt, <br />concrete curbs and sidewalk, lighting and signal <br />• W 8th Avenue Reconstruction, City of Hialeah <br />$5.5M — 3.0 MI of roadway reconstruction <br />including bridge reconstruction, underground <br />utilities, base, asphalt, concrete curbs and <br />sidewalk, lighting and signal <br />• SR 84 Slip Ramp Construction, FDOT — District 4 <br />$3.8M — construction new ingress ramp from SR <br />84 to 1 -595 including widening of 1 -595 and <br />widening of the 1 -75/1 -595 connector ramp <br />CAREER HIGHLIGHTS <br />• 40 years background in <br />engineering and <br />infrastructure construction <br />• 20 years background in <br />design -build and value <br />engineering <br />PROFESSIONAL EXPERIENCE <br />• Owner <br />• Administrator <br />• Project Manager <br />• Estimator <br />• Heavy equipment operator <br />• Mechanic <br />• Surveyor <br />LICENSES/ CERTIFICATIONS <br />• Miami -Dade County <br />Engineering - E2313 <br />• Broward County Engineering <br />-92-1293 <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.