My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Williams Paving Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-11-03 Collins Avenue Streetscape
>
Responses
>
Williams Paving Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2012 12:59:30 PM
Creation date
1/11/2012 4:05:10 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
CollinsAve. Streetscape
Bid No. (xx-xx-xx)
11-11-03
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Westside Collins Avenue Sidewalk from 174 th - 175th Terr. <br />Concrete Sidewalk <br />FDOT Standard <br />LF of full width <br />Demolition /Hauling <br />Specs. <br />sidewalk <br />$ no <br />251 I.f. <br />+-'X76 t • <br />New Sidewalk - <br />FDOT Standard <br />Concrete Pavers on <br />Specs. <br />LF of full width <br />$ <br />251 I.f. <br />Sand and concrete as <br />sidewalk <br />7S .- <br />t �� 8 .1S• <br />necessary - other items <br />Concrete Color Patch <br />Per <br />and Concrete <br />** <br />manufacturer <br />LS <br />$ G$t� <br />restoration <br />secs. <br />Mobilization <br />101 <br />LS <br />Maintenance of Traffic <br />102 <br />LS <br />$�3r� • ° <br />4Z3 �. "' <br />Westside Collins Avenue Sidewalk from 175 Terr. - 178 <br />Concrete Sidewalk <br />FDOT Standard <br />LF of full width <br />Demolition /Hauling <br />Specs. <br />sidewalk <br />$ i I <br />1053 I.f. <br />11 g <br />New Sidewalk - <br />FDOT Standard <br />Concrete Pavers on <br />Specs. <br />LF of full width <br />$ a,o <br />1053 I.f. <br />— <br />4-784 <br />Sand and concrete as <br />sidewalk <br />%S <br />_-S-. <br />necessary - other items <br />Concrete Color Patch <br />Per <br />and Concrete <br />manufacturer <br />LS <br />$ 26CO- <br />restoration** <br />secs. <br />Mobilization <br />FDOT 101 <br />LS <br />�- <br />Maintenance of Traffic <br />FDOT 102 <br />LS <br />PROJECT TOTAL <br />$ <br />NOTES: <br />* The Florida Department of Transportation Standard Specifications for Road and Bridge Construction latest version shall be used <br />for all aspects of this job. <br />* "Color Patch Product: For the base Bid, Contractor shall include the price of the installation and application of the Color Patch <br />Product on a "per location" Lump Sum basis (each location in bold as depicted in the heading). For Add Alternate #11, the Contractor <br />shall provide a price for the rest of the existing paver areas which includes ALL remain blocks COMBINED. Work shall include but <br />shall not be limited to work related to the surface cleaning, preparation, crack filling, surface smoothing, edge leveling, site <br />protection, mobilization, labor, material, and equipment, and other as required to complete the task as per City requirements and <br />manufacturer's recommendations. <br />The cost per items and lump sums listed in the Proposal form shall include the total cost to complete the Work including but not <br />limited to materials, labor, equipment, bonds, off -duty police officers, flag -men, permit application preparation, permitting, permit <br />running, work required to accomplish the construction, coordination costs, and field verification, and others as necessary, and as <br />indicated in the drawings and as intended under this RFP, specifications, addenda, MANDATORY pre - Proposal information and <br />discussions, and any other documents provided to the Contractor by the City to ensure a 100% complete job. <br />These are approximate quantities as developed by the City of Sunny Isles Beach Public Works department. They are generally <br />representative of the work that will be required by the Contractor. CONTRACTOR shall ensure that ALL work for the construction of <br />the proposed roadway improvements is completed within the TOTAL price submitted on this Proposal Form unless it can be proven <br />and agreed in writing by the City that additional work was provided. <br />* * ** Contractor shall ensure that work already completed comply with the requirements of the permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.