My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-01) Traffic Engineering Services
>
Responses
>
R.J. Behar & Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 5:25:31 AM
Creation date
1/11/2012 4:19:46 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Traffic Engineering Services
Bid No. (xx-xx-xx)
11-11-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C I T Y O F <br />T R A F F I C <br />S U N N Y I S L E S B E A C H <br />E N G I N E E R I N G S E R V I C E S of", <br />NORTH BAYSHORE DRIVE OPERATIONAL IMPROVEMENTS <br />CITY OF MIAMI, FL <br />The scope of this project consisted of milling and resurfacing North Bayshore Drive from NE 15th Street to NE <br />17th Terrace and provided a traffic circle to improve traffic operations at the intersection. It also included re- <br />vising the existing median so that the roadway width could accommodate one 164 lane and one 84 parking <br />lane to accommodate future bicycle lanes. RJ Behar provided the planning, alternatives analyses and design <br />services for the project. <br />CLIENT <br />City of Miami <br />Office of Capital Improvements <br />444 SW 2nd Avenue, 8th Floor <br />Miami, FL 33130 <br />Mr. Hector Badia, PE <br />Tel: (305) 419 -1236 <br />E -mail: hbadia @miamigov.com <br />RJ BEHAR'S ROLE <br />Master planning, roadway de- <br />sign including drainage im- <br />provements, signing and mark - <br />ing and lighting design <br />PROJECT STARTED: 2007 <br />PROJECT COMPLETED: 2009 <br />COST/FEES PAID: $102,300.00 <br />CONSTRUCTION COST: $441,000 (Estimate) <br />RJ BEHAR'S KEY PERSONNEL <br />Robert J. Behar, PE - Principal in Charge <br />Anthony V. Alfred, PE - Project Manager <br />Juan H. Vazquez, PE, PH, BCEE - Drainage <br />Engineer <br />Marlin Scattolini - Designer <br />(^= <br />® R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 18 <br />�v, 4 <br />(^= <br />® R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.