My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-01) Traffic Engineering Services
>
Responses
>
R.J. Behar & Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 5:25:31 AM
Creation date
1/11/2012 4:19:46 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Traffic Engineering Services
Bid No. (xx-xx-xx)
11-11-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Florida Department of Transportation <br />RICK SCOTT 1000 NW 1 1 1 Avenue ANANTH PRASAD, P.E. <br />GOVERNOR Miami, Florida 33172 -5800 SECRETARY <br />CLIENT REFERENCE FORM <br />City of Sunny Isles Beach — Request for Qualifications RFQ No: 11 -11 -01 <br />Traffic Engineering Services <br />CLIENT: <br />Name of firm to be contacted <br />Address: <br />Contact Name: <br />Project Performance Period: <br />Location of Project: <br />Value of Design Services <br />Florida Department of Transportation, District 6 <br />1000 N.W. 111 Street, Miami, FL 33172 <br />Mr. Danny Iglesias, PE — Senior Project Manager <br />Tel: (305) 470- 5289/Fax: (305) 470 -6725 <br />E -mail Address: danny.iglesias @dot.state.fl.us <br />03/2010 to 08/2011 <br />Monroe County, Florida <br />$ 287,382.00 <br />BRIEF DESCRIPTION OF THE SERVICES PERFORMED FOR THIS PROJECT: <br />This project consists of 0.80 miles of 4 -lane divided, urban section of SR -5 located in the Florida Keys. The scope <br />of services includes milling and resurfacing, signing and pavement markings, traffic control plans and ADA and <br />pedestrian features upgrades. <br />Referenced Company: R. J. Behar & Company, Inc. <br />7850 N.W. 146th Street, Suite 504 <br />Miami Lakes, Florida 33016 <br />Name of Project: SR- 5 /US -1 Overseas Highway (from Fontaine Drive to S. of Tavernier <br />Creek Bridge) Monroe County, Florida <br />Project Started: 03/2010 - Project Completed: 08/2011 <br />Mr. Danny Iglesias, PE — enior Project Manager <br />Tel: (305) 470 -5289 <br />www.dot.state.fl.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.