My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CGA
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-01) Traffic Engineering Services
>
Responses
>
CGA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 2:45:01 AM
Creation date
1/11/2012 4:54:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Traffic Engineering
Bid No. (xx-xx-xx)
11-11-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LL Calvin, Giordano & Associates, Inc. <br />E X C E P T 1 0 N A Ls 0 L U T I 0 N 5 <br />a <br />NW 131s' STREET WIDENING AND <br />10th AVENUE ROUNDABOUT <br />North Miami, Florida <br />—11"5 ! <br />.ems.. <br />.,,.. <br />�W, <br />CGA provided complete traffic analysis, public outreach, construction documents and <br />permitting for the conversion of the two -way stop controlled intersection of NW 131St <br />Street and 101h Avenue to a modern roundabout. Our plan set included roadway <br />widening to accommodate bike lanes and on- street parking facilities. <br />The roundabout design incorporated dedicated bike lane access routes in accordance <br />with newly adopted roundabout design criteria for Miami -Dade County. <br />All services were provided by CGA's in -house staff and included complete permitting <br />through Miami -Dade County. <br />Client <br />City of North Miami <br />Contact information <br />at time of project: <br />John O'Brien <br />Transportation Planner <br />Community Planning <br />& Development <br />12400 NE 8th Avenue <br />North Miami, Florida 33161 <br />(305) 895 -9883 <br />Project Date <br />2011 <br />Services Provided <br />Traffic Engineering <br />Public Outreach <br />Surveying <br />Landscape Architecture <br />Construction Documents <br />Permitting <br />Principal in Charge <br />Shelley Eichner, AICP <br />Team Members <br />Jeffery Maxwell, PE, PTOE <br />James Spinks, PE, PTOE <br />Bryan Kelley, El <br />Bob Jackson <br />Tammy Cook <br />Company Role <br />Prime <br />Consultant Cost <br />$135,000 <br />Change Orders <br />None <br />TE 0043 NW 131 st Street Roundabout I Page 219 <br />"si <br />—11"5 ! <br />.ems.. <br />.,,.. <br />�W, <br />CGA provided complete traffic analysis, public outreach, construction documents and <br />permitting for the conversion of the two -way stop controlled intersection of NW 131St <br />Street and 101h Avenue to a modern roundabout. Our plan set included roadway <br />widening to accommodate bike lanes and on- street parking facilities. <br />The roundabout design incorporated dedicated bike lane access routes in accordance <br />with newly adopted roundabout design criteria for Miami -Dade County. <br />All services were provided by CGA's in -house staff and included complete permitting <br />through Miami -Dade County. <br />Client <br />City of North Miami <br />Contact information <br />at time of project: <br />John O'Brien <br />Transportation Planner <br />Community Planning <br />& Development <br />12400 NE 8th Avenue <br />North Miami, Florida 33161 <br />(305) 895 -9883 <br />Project Date <br />2011 <br />Services Provided <br />Traffic Engineering <br />Public Outreach <br />Surveying <br />Landscape Architecture <br />Construction Documents <br />Permitting <br />Principal in Charge <br />Shelley Eichner, AICP <br />Team Members <br />Jeffery Maxwell, PE, PTOE <br />James Spinks, PE, PTOE <br />Bryan Kelley, El <br />Bob Jackson <br />Tammy Cook <br />Company Role <br />Prime <br />Consultant Cost <br />$135,000 <br />Change Orders <br />None <br />TE 0043 NW 131 st Street Roundabout I Page 219 <br />
The URL can be used to link to this page
Your browser does not support the video tag.