My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CGA
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-01) Traffic Engineering Services
>
Responses
>
CGA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 2:45:01 AM
Creation date
1/11/2012 4:54:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Traffic Engineering
Bid No. (xx-xx-xx)
11-11-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />' I <br />h Calvin, Giordano & Associates, Inc. <br />^' 6 E X C E P T 1 0 N A L 5 0 L U T I 0 N 5 <br />a <br />SABRINA BAGLIERI <br />Constructability Review and Cost <br />SUMMARY OF QUALIFICATIONS <br />Ms. Baglieri has 22 years of experience as a civil engineer. She is an expert in the <br />selection, setup, management, and control of roadway, parks and buildings projects <br />EDUCATION <br />from the bidding process to its culmination, including management of the hurricane <br />B.A., Civil Engineering, <br />debris collection monitoring and data recording. Ms. Baglieri has extensive computer <br />Universidad Rafael Urdaneta <br />knowledge on operative systems such as DOS, Windows and the following programs: <br />Maracaibo, Venezuela <br />Cadd2000, Excel, Microsoft Word, Timberline, Construction Link (CLI), Primavera, <br />PowerPoint, and Quattro Pro for Windows. <br />CERTIFICATIONS <br />Governor's Hurricane <br />Ms. Baglieri has extensive experience and knowledge directly applicable to all types of <br />Conference <br />projects, relying on her background in engineering, construction and project <br />Recovery Disaster -The <br />administration. Furthermore, she is well versed in the municipal processes necessary to <br />Local Government Role <br />get work tasks completed on time, as well as she has demonstrated experience working <br />within allocated budgets. These skills and aptitudes have all been exercised in her <br />Erosion Control Certified <br />capacity as Director of Capital Improvements for several local municipalities through <br />Inspector <br />Calvin, Giordano & Associates' various continuing services municipal contracts. The <br />CTQP Final Estimates 1 <br />breadth of her work has spanned all realms of implementation projects - from small <br />CTQP Earthwork <br />residential - scale, community - scale, and urban scale. As such she has the necessary <br />Construction Inspector 1 <br />knowledge in the management of the dynamics inherent in work scheduling, tasking, <br />sequence matrices necessary to maintain continuity of work and fulfillment of the <br />CTQP Asphalt Paving <br />assessed milestones. These are important issues, especially when dealing with LAP <br />Technician Level 1 <br />funding, grants monies, bond assessments, and in both responding to the expressed <br />OSHA Construction Safety <br />needs of the community and to the management of complaints and issues in an <br />+ Health <br />expedited manner <br />PROJECT EXPERIENCE <br />City of Weston, Florida Projects <br />Vista Park: <br />- Boulevard: new roadway construction <br />- Vista Park Development: Construction of 4 soccer fields, 4 softball fields, 2 <br />concession buildings, a maintenance building, and parking area. Provided <br />lighting, lift station, water and sewer designs. <br />• Traffic Signals for Weston Road /South Commerce Parkway <br />• Tequesta Trace Concession Building Parking and Drainage <br />• Bonaventure Master Plan Phase 1, II, 1I1 and IV. Upgrade of all drainage, <br />landscape, and roadway elements. <br />• Saddle Club Rd @ South Post Road Roundabout <br />• Bonaventure Blvd. @ Blatt Road Roundabout <br />• New traffic signals for Weston Road /North Corporate Lakes <br />• FS 55 Emergency Signal <br />• Saddle Club /Arvida /Bonaventure overlay of roads and road /drainage <br />improvements <br />• Bonaventure /Racquet Signal <br />• Regional Park /Parking Modification. Construction of Loop Road to connect <br />existing parking lots. <br />Page 3122 <br />
The URL can be used to link to this page
Your browser does not support the video tag.