My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CGA
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-01) Traffic Engineering Services
>
Responses
>
CGA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 2:45:01 AM
Creation date
1/11/2012 4:54:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Traffic Engineering
Bid No. (xx-xx-xx)
11-11-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br />o\ Calvin, Giordano & Associates, Inc. <br />E S f E P T 1 0 N A L S 0 L LI i 1 0 N <. <br />s <br />Indication of How Long It Would Take to Implement Service After Authorized <br />to Begin: <br />Calvin, Giordano & Associates, Inc. can begin work on the project the day of receiving the Notice to Proceed <br />from the City of Sunny Isles Beach. The engineering staff assigned to this project has the capacity to begin <br />immediately working on the project gathering as- builts and permits. Our survey department staff can place <br />a crew in the field within 48 hours of receiving the Notice to Proceed to begin the design survey. From that <br />point, all other services would follow uninterrupted. Based on our experience with these types of projects <br />and more specifically our permitting experience with FDOT and Miami -Dade County on these types of <br />projects, CGA would expect that our team would have an advantage with shorter length of time permitting <br />and fewer RAIs than most other firms would. <br />RFQ #11- 11 -01, Traffic Engineering Services Page 1 1 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.