Laserfiche WebLink
<br /> <br />) <br /> <br />2. Qualifications <br />Chen Moore and Associates (CMA) is a multi-discipline consulting firm that is a Florida State MBE <br />certified and locally certified CBE firm located in Miami, Fort Lauderdale, West Palm Beach, Stuart <br />and Gainesville, Florida. Chen Moore and Associates, founded in 1986, has grown to a staff of 28 full- <br />time personnel. The firm has successfully completed a wide range of projects involving the planning, <br />design and construction in a multitude of disciplines including: <br /> <br />. Civil Engineering including drainage, roadway, water distribution/supply/treatment, wastewater <br />collection/transmission/treatment/disposal, pump station design and rehabilitation, utility <br />coordination and stormwater pollution prevention <br />. Environmental Engineering <br />. Infrastructure Master Planning <br />. Site Master Planning <br />. Landscape architecture and urban design including hardscape design <br />. Reuse and Irrigation Design <br />. Program Management <br />. GIS analysis and mapping <br />. Grant and loan services <br />. Bidding and Construction Administration Services <br />. Construction management, supervision, inspection and administration. <br /> <br />The firm includes 12 licensed professional engineers, seven LEED Accredited Professionals and a licensed <br />landscape architect. The firm is celebrating its 25th anniversary in business serving South Florida and <br />our Miami Office is celebrating its 14th anniversary in Miami-Dade County. <br /> <br />\ <br /> <br />CMA's Unique Qualifications for this project <br />. The Chen Moore Team is prepared and available to expedite the project for the City of Sunny Isles <br />beach upon receipt of a Notice to Proceed. Tasks already completed and information aleady <br />obtained include: <br />Site visit has been conducted <br />Analysis of existing aerials and UDAR data <br />Identifying, contacting and receipt of as-built/altas' <br />for existing utility information <br />Performed preliminary GIS analysis and stormwater <br />model <br />Coordination with out geotechnical investigation <br />team members to obtain general subsurface <br />conditions to conduct a preliminary evaluation of <br />possible solutions <br />Identification of additional items to be considered <br />in the development of the proposed project solutio. E;.:;__ <br />c..".--............ <br />current codes requirements regarding ADA gradin ;~ . ~ <br />driveway access connections to the project area/coo 'sf . "._ ' <br />Preliminary discussions with regulatory agencies :' "8l: ..;~ <br />concerning the possible solutions to identify both <br />time saving and cost saving opportunities for the <br />City in proposing a solution. <br />. The Chen Moore Team has worked together on <br />numerous projects with very similar scope and budget <br />for several municipalities successfully. <br /> <br />=~::~ <br />.,.,. <br />."0 <br />." <br />.." <br />:::.: <br />.,.. <br />~~:). <br /> <br />~ <br /> <br />(I <br /> <br />,~ <br />CitvofSunrryl$.lesBeach <br />NE 174Slfeel <br />DraioagllAnalysis <br />r.og\l'e2: E.isl:ingDainageStrudu'll'S <br /> <br />~ <br />