Laserfiche WebLink
<br />) <br /> <br /> <br />QA/QC Principal-in-Charge <br />Dr. Ben Chen, P.E., BCEE 1-- <br /> Peter Moore P.E., LEED AP <br /> . Project Manager <br /> Jose.Acosta, P.E. <br /> <br />Support Staff <br /> <br />) <br /> <br />Government Permitting <br />Michael Buick, P.E. <br /> <br />Drainage Design <br />Oscar Bello, P.E. <br /> <br />Utility Coordination and Design <br />Meghan Wells, E.!., LEED AP <br /> <br />Construction Engineering and Inspections <br />Marlon John <br /> <br />Geotechnical Engineering <br />Richard Wohlfarth, P.E. (Nutting Engineers of FL) <br /> <br />.Survey <br />James Stoner, PSM (Stoner & Associates) <br /> <br />'"Note: Miami-Dade County certifiedCBE firm. <br /> <br />Key Personnel I Function in the Company <br />Peter Moore P.E., LEED AP President <br />Dr. Ben Chen, P.E., BCEE ;~ Chairman <br />Jose Acosta, P.E. Senior Engineer, Branch Manager <br />Michael Buick, P.E. Senior Engineer <br />Oscar Bello, P.E. Senior Engineer <br />Meghan Wells, E.!., LEED AP Associate Engineer <br />Marlon John Engineering Inspector <br /> <br />