My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chen-Moore & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
Chen-Moore & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2012 3:46:49 PM
Creation date
1/12/2012 2:55:43 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~) <br /> <br />\ <br />I <br /> <br />Details of Entity Business Structure (Corporation, Partnership, LLC) <br />Chen Moore and Associates Florida corporation. A copy of our corporate charter is located on page 1-4. <br />A copy of our fictitious name certificate is on page 1-3. <br /> <br />Date Founded <br />November 7, 1986. <br /> <br />Home office address, telephone number, and local address and phone number <br />Home Office Address <br />500 West Cypress Creek Road, Suite 410 <br />Fort Lauderdale, FL 33309 <br />Telephone: (954) 730-0707 <br /> <br />Local Address <br />1444 Biscayne Boulevard, Suite 204 <br />Miami, FL 33132 <br />Telephone: (786) 497-1500 <br /> <br />List of any outstanding litigation that would threaten the viability of the firm or the performance of <br />this contract <br />Neither Chen Moore and Associates nor its parent or subsidiaries, predecessor organization(s), nor any <br />wholly owned subsidiary has had any claims, arbitrations, administrative hearings, or lawsuits brought <br />by or against the firm during the last five years. <br /> <br />Proof of insurance <br />Please see page 1-5. <br /> <br />Indication of how long it would take to implement service after authorized to begin <br />Key personnel are currently ready to and available to begin work on this project and will work with the <br />City's schedule to complete the design, permitting and bid documents within the City's schedule. <br /> <br />Please refer to the schedule included in Section 2, Qualifications, for a detailed outline of our proposed <br />time line. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.