My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
R.J. Behar
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2012 3:59:20 PM
Creation date
1/12/2012 3:47:54 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />In the areas where the new French drains will be constructed, the complete lane will need to <br />be re-constructed due to the excavations, The percolation values we found in projects near the area <br />are very low in the range of 10 -5 to 10 -6. Based on these values, this alternative will most likely only <br />provide marginal improvements. The advantage of this alternative is lower cost and it is more easily <br />permitted. <br /> <br />-, <br /> <br />B. Implementation of exfiltration systems in combination with injection wells. In this alternative, the <br />injection well is the disposal system, while the French drains provide water quality treatment prior to <br />injection. This alternative avoids the need for a new outfall, making it the second easiest to permit and <br />implement. <br /> <br />) <br /> <br /> <br />- <br /> <br />Injection Well <br />French Drain <br /> <br />! N <br /> <br />Since the percolation in the area is low, this alternative provides for the use of the wells for additional <br />disposal capacity. Based on the data obtained, we estimate that 2 injection wells will be needed, <br /> <br /> <br />The injection well box has an <br />additional 90 second retention time 'NI A <br />also for additional water quality and 3 J <br />sedimentation, In recent projects, we <br />have noticed the price for these <br />injection wells has lowered due in part <br />to the economic situation, making <br />injection wells a very feasible and also <br />reasonably economic option. <br /> <br />4' <br />I.IIN, <br /> <br />) <br />tjJ <br />I <br /> <br /> <br />C. <br />PIPE <br /> <br />rfilll R .J.Behar <br />~-111 [ <br /> <br />WEIR EL. 0 <br /> <br />2' <br />11 <br /> <br />~~ <br /> <br />R. J. BEHAR & COMPANY, INC. I RFQ No. 11-11-02 I 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.