Laserfiche WebLink
<br />. Water Meter Disconnect <br />. Sewer Cap <br />. Any other utility not listed, but required to demolish subject building <br /> <br />EXCLUDED: <br /> <br />Prices exclude any asbestos abatement (or any other abatement), handling or hauling of any <br />hazardous or regulated materials, additional grading and importing of fill not listed in the <br />inclusions, material to elevate site, storage tank removal, adjacent property protection, shoring, <br />bracing, underpinning, pile extraction, tenant refuse, permanent fencing, any tree not permitted <br />to be demolished by DERM, tree mitigation fees, recycling fees, gutting/soft stripping of <br />building, site security, surveys, clearing and grubbing of site, seeding/sodding, cranes, traffic <br />control, elevator removal, sidewalk/curb & gutter repair damaged by heavy equipment, major <br />mechanical equipment such as boilers, chillers, cooling towers, Etc., excavation or backfill, <br />earthwork and erosion control. Excludes salvage value. <br /> <br />NOTES: <br /> <br />HCI should occupy the entire work area exclusively upon the commencement of HCI's work. <br />Customer will convey to HCI all rights to, title to and interest in all building contents and/or <br />salvage materials not listed above that are currently located within the dismantling area. <br /> <br />FEE: <br />The proposed fees to perform these services are: <br /> <br />151 Sunny Isles Boulevard <br />215 Sunny Isles Boulevard <br /> <br />$49,520,00 <br />$46,000.00 <br /> <br />It should be noted that this fee is subjected to change if the scope of work is changed or <br />modified. <br /> <br />Payment schedule as follows: ~ <.{lOI'\ ~Cv't1o") ~ C2:n -+~c;:f <br />?-t"Q ~r \'~",,-'.-\4if'\"ot(~t~e;v , \ ~ /:i\ A9r <br />~;er%upon~et:t#(7nof~,~.r--Ttl ~....~ ~o\Jv '1"'2...:;,. to"\.. ~U_ __ <br />50% upon completion, ~ ~ <br />~ <br />Tentative Performance Schedule <br /> <br />Notice to Proceed <br />Permitting: 5 weeks <br />Asbestos Abatement (If required): 4 weeks <br />Building and Asphalt Demolition: 3 weeks <br /> <br />HCI appreciates the opportunity to submit this proposal and look forward to working with you <br />on this project. Please call us if you have any questions or concerns, <br /> <br />('l&lf") <br />,) d D <br />