My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ABC Construction, Inc
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 12-01-01 Restroom Structural Beam Restoration
>
Responses
>
ABC Construction, Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2012 8:58:52 AM
Creation date
2/8/2012 8:56:53 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Restroom Structural Beam Restoration
Bid No. (xx-xx-xx)
12-01-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> rl <br /> r 1 <br /> r 1 <br />I f 1 <br />I <br />I r 1 <br />I <br />I <br />I <br />I U <br />-, I <br /> I <br /> : I <br />I r I <br />, <br />1 i1 <br /> , I <br /> l I <br /> . I <br /> <br />l I <br /> <br />LA ~B O'e 0 CONSTRUCTION, INC. <br /> <br />February 06, 2012 <br /> <br />REQUEST FOR PROPOSAL NO. 12-01-01 <br />RESTROOM STRUCTURAL BEAM RESTORATION <br /> <br />To: CITY OF SUNNY ISLES BEACH <br />18070 COLLINS AVENUE <br />SUNNY ISLES BEACH, FLORIDA 33160 <br /> <br />Proposal for the proposed restoration of the structural concrete beams of the one-story restroom <br />building located in the City of Sunny Isles park located within the "beach access" path near 19111 <br />Collins Avenue in Sunny Isles, Florida. <br /> <br />~ Review of available drawings for the existing construction for the purpose of <br />coordinating it with the proposed construction, <br />~ Visual observation of the existing structure as it relates to the proposed construction, <br />~ Consultation and coordination with all. <br />~ Research of the Building Code and other local ordinances affecting structural design and <br />construction for this project. <br />~ Participation in necessary design phase meetings, <br />~ Structural analysis design and construction. <br />~ Preparation of repair and restoration drawings for submission to the Building <br />Department. <br />~ Preparation of technical specification sections for structural systems (specifications <br />may be in the form of notes on the drawings), <br />~ Preparation of a package of structural calculations for submission to the Building <br />Department, 13. responses to Building Department review comments. <br />~ Perform all necessary repairs and restoration in accordance with structural engineers <br />design criteria, <br /> <br />We propose to construct the work of this project for the following sum: <br /> <br /> <br /> <br />State Certified General Contractor CGCA60037 <br />7215 NW 7TH STREET MIAMI, FL 33126 PH: (305) 663 0322 FAX: (305) 267 2403 <br />
The URL can be used to link to this page
Your browser does not support the video tag.