My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sustainable Restoration
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 12-01-01 Restroom Structural Beam Restoration
>
Responses
>
Sustainable Restoration
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2012 9:25:04 AM
Creation date
2/8/2012 9:24:32 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Restroom Structural Beam Restoration
Bid No. (xx-xx-xx)
12-01-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />h~~ <br />S · ,1PIlf&~. <br />ustalu1l'u e e$toratlon <br />~~r <br />CGC #1515891 <br /> <br />. Removal and replacement of electrical, mechanical and plumbing equipment, <br />lines, conduit, and all other miscellaneous appurtenances as necessary <br />. Sidewalk permits and any other special barricades or traffic control <br />equipment or signs <br />. No parked cars within 40 feet of work area <br />. If the work falls under a hurricane watch or warning, the cost for extra <br />demobilization and remobilization will be extra. This will be billed at time and <br />material rates of $ 55.00 per man hour and materials at cost plus 20 %. <br /> <br />Notes: <br />The aboved quantities are based on a visual inspection of the current conditions of the property at the address listed <br />above. All parties agree that the quantities are estimated and are subject to change. <br /> <br />This proposal must be included in any subsequent contract and serve as the scope of work as well any inclusions or <br />exclusions. This proposal subject to revision or cancellation unless accepted within 30 days. Material prices are subject to <br />review after 30 days if delivery exceeds 30 days from date of contract. As per florida statute, deposits are non-refundable. <br /> <br />This proposal, when accepted by the buyer and approved by Sustainable Restoration,lnc. becomes a contract document <br />in full force and binding on both parties. Owner authorizes Sustainable Restoration, Inc to place signs on the premises for <br />the duration of contract. <br /> <br />We look forward to hearing from you soon, <br /> <br />PROPOSAL ACCEPTANCE: <br /> <br />-O~ <br /> <br />Signature <br /> <br />Sustainable Restoration,lnc. <br /> <br />Print <br /> <br />2235 SW 27th Terr Miami,FL 33133 Ph: 786-337-5006 Fax: 888-533-0913 <br />URL: http://flbuildgreen.com email: sustainablerestoration@gmail.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.