My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Coastal Systems International, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
Coastal Systems International, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2012 4:27:38 PM
Creation date
2/8/2012 4:25:04 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />) <br /> <br /> <br />~ Ardarmn & Associates, lroc. ([j) I <br />=.::.:..a.::.: C'roochicaJ. EnvirCXlTerla ad HAD 0 N N E <br />~ Mltaias CorIsUlarts <br /> <br />December 2,2011 <br />City of Sunny Isles Beach <br />Request for Qualifications <br />Civil Engineering Services to Design <br />Street and Drainage Improvements <br />RFQ No.: 11-11-02 <br />Page 14 <br /> <br /> <br />r- <br /> <br />) <br /> <br /> <br /> <br /> <br />Jose Marti Gymnasium, Miami, Florida <br />Coastal Systems provided civil engineering services for the Jose <br />Malti Park as palt of the design team led by Zyscovich. These <br />services include the design of a drainage system for a I-acre site <br />located paltially below Interstate 95. <br /> <br />The design consisted of a drainage well to contain the stormwater <br />runoff from the new building/gymnasium. The remaining site <br />stormwater runoff was managed by using 38-linear feet of <br />exfiltration trench system and various dry retention areas. Paving, <br />grading and stormwater management plans were prepared, that <br />included Right-of-Way improvements for southwest 5th Street. <br /> <br />Coastal Systems also provided water and sewer design to service <br />the new building/gymnasium. The design included over 2,200 <br />linear feet of 8-inch water main with fire, domestic and irrigation <br />service. A new 6-inch sanitary sewer line was connected to an <br />existing sanitary manhole to service the new building. <br />Construction administration services were also provided. <br /> <br />Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661-3655 . Fax: 305-661-1914 <br />Regional Office: 2047 Vista Parkway, Suite 1010 West Palm Beach, Florida 33411 . Tel: 561-640-1003 . Fax: 561-640-1009 <br />'WV.'W .coastalsVSlemsint.come info@coastalsystemsint.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.