My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Coastal Systems International, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
Coastal Systems International, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2012 4:27:38 PM
Creation date
2/8/2012 4:25:04 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~, <br /> <br />a <br /> <br />SYSTEMS <br />~ <br /> <br />December 2, 2011 <br />City of Sunny Isles Beach <br />Request for Qualifications <br />Civil Engineering Services to Design <br />Street and Drainage Improvements <br />RFQ No.: 11-11-02 <br />Page 21 <br /> <br />..... Ardarmn & Associates, Inc. ([j) I <br />--=.a.= C'roochicaJ. EnvirCXlTerla ad H A DO N N E <br />~ Walenas CorIsUlarts <br /> <br />Schedule of Proposed Services <br />Coastal Systems goal for effective project management is to clearly define scope and fee budget for a <br />project from the beginning, in close conjunction with the City of Sunny Isles Beach. Roles and <br />responsibilities are clearly conveyed and a project schedule established with milestones. Coastal Systems <br />strives to define the regulatory strategy prior to submitting permit applications through pre-application <br />meetings and an in-depth knowledge of state and federal permitting regulations. Coastal System <br />anticipates the schedule as follows: <br /> <br />Schedule of Work <br />Surveying and SubsUlface Utilities <br />Preliminary Design <br />Environmental Permitting <br />Final Design <br />Total Engineering and Permitting <br /> <br />Duration <br />30 Days <br />30 Days <br />90 Days <br />30 Days <br />180 Days <br /> <br />Bidding and Contract Award <br />Construction <br />Total Project Duration <br /> <br />90 Days <br />120 Days <br />390 Days <br /> <br />) <br /> <br />Cotporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661-3655 . Fax: 305.661-1914 <br />Regional Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411 . Tel: 561.640-1003 . Fax: 561-640-1009 <br />www.coastalsvstemsint.comeinfo@coastals).Stemsint.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.