Laserfiche WebLink
<br /> <br />December 2, 2011 <br />City of Sunny Isles Beach <br />Request for Qualifications <br />Civil Engineering Services to Design <br />Street and Drainage Improvements <br />RFQ No.: 11-11-02 <br />Page 52 <br />Johnny Martinez, P.E, <br />City Manager <br /> <br />} <br /> <br />~it!' of miami <br /> <br />November 16, 2011 <br /> <br />Re: Coastal Systems International, Inc. <br /> <br />Coastal Systems International has been under contract with the City of Miami for Miscellaneous Coastal <br />Marine engineering projects since 2004. As palt of this task-based contract, Coastal Systems has <br />completed a variety of engineering design, environmental permitting and construction administration <br />services for the City. Among those projects was the Museum Park Large Vessel Mooring Facility project <br />which consisted of the installation of 16 large vessel mooring dolphins adjacent to Museum Park and <br />within the sensitive marine environment of Biscayne Bay. <br /> <br />Coastal Systems provided engineering design, environmental permitting services with Federal, State and <br />Local agencies, assisted with the City's bidding process, and provided construction administration <br />services during the construction phase of the pl'Oject. The total cost of the project was approximately <br />$1,500,000. The project design, permitting and construction were completed on time and within budget. <br /> <br />) <br /> <br />The professional services provided by Coastal Systems were above expectations and conducted in a very <br />professional manner responsive to the client needs. If you have any questions, please feel free to contact <br />me at (305) 416-1094. <br /> <br /> <br />CAPITAL IMPROVEMENTS PROGRAM <br />444 SW 2nd Avenue, 8th Floor I MiamI, FL 33130 I (305) 416-1280 I Fax: (305) 416-2163 <br />Mailing Address: P.O. Box 330708 Miami. FL 33233-0708 <br />