My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Coastal Systems International, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
Coastal Systems International, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2012 4:27:38 PM
Creation date
2/8/2012 4:25:04 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />lD <br />-') <br /> <br />\ <br />I <br /> <br />December 2, 2011 <br />City of Sunny Isles Beach <br />Request for Qualifications <br />Ci viI Engineering Services to Design <br />Street and Drainage Improvements <br />RFQ No.: 11-11-02 <br />Page 54 <br /> <br />City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov <br /> <br />MIAMI BEACH <br /> <br />PUBLIC WORKS DEPARTMENT, Environmental Division <br />Tel: 305.673.7080, Fax: 305.673.7028 <br /> <br />December 1, 2011 <br /> <br />To Whom It May Concern: <br /> <br />The City of Miami Beach has retained Coastal Systems International for Environmental Coastal <br />Engineering services on numerous projects since 2001. Coastal Systems completed the <br />engineering design, environmental permitting and construction administration services for the <br />Bayfront Steetends Project located along Biscayne Bay in the City of Miami Beach. <br /> <br />Coastal Systems designed and secured environmental permits for streetend waterfront <br />improvements at four (4) locations: 1) Island View Park, 2) South Shore Drive, 3) 10th Street and <br />4) Lincoln Road. Each streetend consists of bulkhead replacement, streetscape improvements <br />(paving, grading, lighting and landscaping), and stormwater management improvements. The <br />scope of services included hydrographic surveys, marine resource (seagrass) mapping, <br />engineering design, environmental permitting (including Miami-Dade DERM), and assistance to <br />the City with bidding and contract award as well as construction administration. The total cost of <br />construction for the Island View Park Project was approximately $350,487, the Lincoln Road <br />Project was approximately $633,822, and 10th Street is scheduled for construction in March <br />2012 with a budget of $945,640. <br /> <br />The level of professional services and workmanship provided by Coastal Systems International <br />met all expectations and displayed a high level of professionalism. If you have any questions or <br />require additional information, please do not hesitate to contact me at 305.673.7080 or <br />ewheaton@miamibeachfl.Qov. <br /> <br />Sincerely, <br /> <br />~ <br /> <br />Elizabeth Wheaton <br />Interim Environmental Resources Manager <br /> <br /> <br />F:\WORK\$ALL\(1) EMPLOYEE FOLDERS\BETSY WHEATON\GENERAL\Coastal Letter,doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.