My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Coastal Systems International, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
Coastal Systems International, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2012 4:27:38 PM
Creation date
2/8/2012 4:25:04 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
) <br /> <br />a <br /> <br />SYSTEMS <br />~ <br /> <br />--- Ardarmn & Associates, Inc. ([j) I <br />=~ C'roochicaJ. EnvirCXlTerla ad HAD 0 N N E <br />--. Mltenas CorIsUlarts <br /> <br />December 2, 2011 <br />City of Sunny Isles Beach <br />Request for Qualifications <br />Civil Engineering Services to Design <br />Street and Drainage Improvements <br />RFQ No.: 11-11-02 <br />Page 6 <br /> <br />2. QUALIFICATIONS <br /> <br />._~ <br />M" <br /> <br /> <br />\ <br />} <br /> <br />~ <br /> <br />Miami Beach Standard Tideflex <br />Outfall Structure <br /> <br />The Coastal Systems engineering team works closely with diverse <br />project teams to provide engineering services for site development <br />and Right-of-Way projects. Paving, grading and drainage design <br />services are provided along with water and sanitary sewer services. <br />Working relationships are also maintained with state and local <br />regulatory agencies to facilitate plan compliance with applicable <br />codes and regulations. Coastal Systems is uniquely organized with <br />engineering and permitting staff in-house to address environmental <br />resource and coastal constlUction permits that may be required. <br /> <br />The best civil works project is the one you do not notice because it <br />functions smoothly and seamlessly with the surrounding <br />environment. The Coastal Systems team has a proven track record <br />in completing high quality infrastructure improvement projects <br />that include paving, grading, drainage, water and sewer, landscape <br />and related elements. The Coastal Systems team uses a variety of <br />tools to ensure a positive experience for the various user groups as <br />well as minimization of client costs and maintenance issues. Our <br />dedication to open lines of communication and proven project <br />management strategies reduces the amount of client oversight <br />required and streamlines all phases of project implementation <br />including production of plans, securing permits, and facilitating the <br />bid and construction phase of the process. <br /> <br />Barrier island stormwater management design is a unique, <br />specialty consulting service provided by Coastal Systems. With <br />in-house civil/coastal/waterfront engineers, the team is <br />experienced in designing challenging drainage systems on Miami- <br />Dade County's barrier islands for both private and public sector <br />clients. Coastal Systems has completed over 10 Right-of-Way <br />paving/grading/drainage design projects for the nearby City of <br />Miami Beach with similar groundwater and elevation conditions as <br />Sunny Isles Beach. All of these projects required a combination of <br />drainage systems common in South Florida, including drainage <br />wells, exfiltration trenches, and outfalls to Biscayne Bay. <br /> <br />Coastal Systems pioneered a unique outfall structure that is now a <br />standard for the City of Miami Beach as shown in the graphic on <br />this page. This structure incorporates a Tideflex valve that is fully <br />serviceable within a concrete drainage structure. Due to local tidal <br />conditions, the outfall elevation is critical for the performance of <br />the drainage system, and the Tideflex valve prevents the influx of <br />bay water into the storm drains. <br /> <br />Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305-661-3655 . Fax: 305.661-1914 <br />Regiooal Office: 2047 Vista Parkway, Suite 101. West Palm Beach, Florida 33411 . Tel: 561-640-1003 . Fax: 561-640-1009 <br />www.coastalsvstemsint.com.info@coastalsystemsint.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.