My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CSA
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
CSA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2012 5:06:27 PM
Creation date
2/8/2012 5:02:19 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs.
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />1 <br />1 <br />~l <br />1 <br />~l <br />~ 1 <br />~ I <br />~ I <br />: J <br /> <br />Section 3 <br /> <br />STAFFinG <br /> <br />Our organizational chart includes the key members} <br />whose primary functions will be geared around the <br />areas of expertise demanded by the scope of each <br />project. Individual project managers will of course <br />be identified for each assignment and all necessary <br />support staff will then be allocated to provide these <br />services in accordance to said scope. The personnel <br />that we assign in the capacity of project managers are <br />officers of the firm fully authorized to represent CSA <br />Group in every aspect required by the contract. Dr. <br />Carlos Mallot P.E. who will serve as the Principal-In- <br />Charge of this contract} will maintain authority over <br />all management staff} and will proactively serve as an <br />extension of the City of Sunny Isles Beach}s staff. <br />The CSA Team is prepared to commit the full strength <br />of its company and team members to ensure that every <br />project entrusted to our Team will be performed with <br />the Citis needs and that projects are delivered with <br />the highest quality} on time and within budget, with <br />CSA Team members working side by side with City staff <br />to ensure a successful outcome} every step of the way. <br />The City should consider the following representative <br />qualifications of the CSA Team: <br /> <br />r r <br />< J <br /> <br />, I <br />l I <br /> <br />, I <br /> <br />. I <br /> <br />\ I <br /> <br />. J <br /> <br />< J <br /> <br />, I <br /> <br />CSA is the largest and fastest growing Hispanic-owned <br />full services engineering and architectural consulting <br />firm throughout the United States} the Caribbean and <br />Central America. CSA prides itself in offering clients <br />reliable service} consistent quality} and outstanding <br />professional integrated professional services for over <br />52 solid years. <br />CSA has an in-house staff of 800 plus professionals <br />including over 125 licensed engineers and architects} <br />and over 30 scientists with an acumen of expertise <br />in over 48 technical disciplines. Locally, we have 35 <br />Professional Engineers} 7 Registered Architects} 5 <br />Professional Surveyors and Mappers} and 25 Field <br />Inspectors. CSA has an environmental staff of over <br />32 experts} which include geologists} ecologists} <br />hydrologists} environmental engineers} water resource <br />engineers and GIS specialists} who have performed <br />numerous environmental studies and assessments <br />and prepared environmental permitting documents. <br />Included in the group is Registered Environmental <br />Managers (REML Qualified Environmental Professionals <br />(QEPL Certified Arborists} and Wetland Scientists <br />experts. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.