Laserfiche WebLink
<br /> <br /> rl <br /> r 1 <br /> r 1 <br /> , I <br /> , J <br /> I <br /> 'l <br /> . J <br />I . J <br />I ~ J <br />I <br />I <br />i L ~ <br />I <br />I <br /> <br />, I <br /> <br /> <br /> <br />CIVIL ENGINEERING SERVICES <br />TO DESIGN STREET AND DRAINAGE IMPROVEME ";jf~{ <br />BID NO. 11 - 11 -02 <br /> <br />Golden Beach Capital Improvements - Master Planning, Design & Construction Phase Services <br />Golden Beach. Florida <br /> <br />This comprehensive Capital Improvements Program Master Plan focused on three major improvement areas: <br /> <br />Town-wide Drainage Improvements - These improvements included design review, costs analysis, and recommendations based <br />on the Town's existing stormwater master plan which includes construction inlets and culverts to collect and direct stormwater <br />runoff to pumping stations discharging into the intracoastal waterway. <br /> <br />Utilities Underground Relocation (electrical, telephone, cable) - These improvements included a thorough analysis of the <br />Town's existing power system configuration, and close coordination with FPL and other utility companies in developing a <br />conceptual plan for burying all utility transmission and distribution lines throughout the entire Town. <br /> <br />Town-wide Streetscape & Traffic Calming - The Town's major thoroughfares and side streets were redefined and enhanced to <br />increase public safety, and improve the quality of life and aesthetic appeal. Improvements included highlighting intersections with <br />concrete pavers and crosswalks, delineating of roadways with valley edge gutters, construction of traffic splitter islands and center <br />median with new landscaping, and new lighting. <br /> <br />The Master Plan carefully considered the each of these with respect to feasibility, cosUbenefit, and design, as well as an analysis <br />of funding options and scenarios, and schedule for phasing and implementation. <br /> <br /> <br />9 <br />