Laserfiche WebLink
<br /> <br />rl <br /> <br />CIVIL ENGINEERING SERVICES <br />TO DESIGN STREET AND DRAINAGE IMPROVEMIi . J; ,,' <br />BID NO. 11 - 11-02 <br /> <br />Midway Pump Station <br />Miami, Florida <br /> <br />C3TS was retained by Miami-Dade County to design and permit a stormwater pump station and forcemain under the SR 826 <br />discharging to the North Line Canal through an energy dissipating structure and outfall. The pump station will transmit the runoff <br />collected from the existing collection system to the North Line Canal through directionally bored twin 24-inch diameter carrier pipes <br />in two 36-inch HDPE casing pipes that cross under FOOT's SR-826 Expressway, The system was modeled resulting in collection <br />system improvements to provide adequate flood protection to the area, including additional exfiltration trenches (French drains). <br /> <br /> <br />-( <br /> <br />.1 '.. <br /> <br />.... <br /> <br />.... <br /> <br />..,'1 <br /> <br />''i <br /> <br />.<;. <br /> <br />.... <br /> <br />__.1'. , <br /> <br />,t "UM"" ST^T'ON ,~BI~^N <br /> <br />1'-- .- <br /> <br />" <br /> <br />::' <br /> <br />II <br />I' <br />I <br />" <br />L':: <br /> <br />it <br /> <br />- J: .. I: ' <br />~ <br /> <br />, . <br /> <br />I' <br /> <br />tE <br /> <br />:::.:::;.",,,,.:,- <br /> <br />16 <br />