Laserfiche WebLink
<br />1 <br />r I <br />r ] <br />r 1 <br />I '1 <br />I <br />I 'J <br /> <br />t5 <br /> <br />COR ZO <br />CASTELLA <br />CARBALLO <br />THOMPSON <br />SALMAN <br /> <br />ARCHITECTURE <br />ENGINEERING <br />ENVIRONMENTAL <br />PUBLIC RELATIONS <br />URBAN PLANNING <br /> <br />EB0005022 <br />AAC002142 <br /> <br />c I <br /> <br />I <br />I . f <br />J <br /> <br />December 1,2011 <br /> <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br /> <br />Attention: <br /> <br />Ms. Jane Hines, CMC, City Clerk <br /> <br />Bid No. 11-11-02 <br />Civil Engineering Services to Design Street & Drainage Improvements <br /> <br />Reference: <br /> <br />Dear Ms. Hines and Selection Committee Members, <br /> <br />The firm of C3TS is pleased to submit this proposal for Professional Civil Engineering Services to <br />Design Street and Drainage Improvements for 174 Street west of Collins Avenue in the Winston Towers <br />neighborhood. <br /> <br />In preparing for this proposal, our Project Team, led by Daniel J. Grandal PE, a Certified Floodplain <br />Manager, has reviewed the technical requirements of the project and visited the site to familiarize with <br />the exiting site conditions. Based on the proposal Scope of Services and our understanding of the <br />project needs, the critical goals for the project are as follows: <br /> <br />"Complete design development for the construction of a drainage system along 174th Street, <br />from Collins A venue west to just beyond the first complex curve and consisting of an <br />interconnected system discharging into a deep gravity well or an outfall or a combination of <br />both" <br /> <br />To accomplish these goals, we will not only look at providing an interconnected system with deep wells <br />and/or outfalls, but we will also identify other potential solutions attainable under the project budget. The <br />existing and proposed drainage systems will be analyzed and modeled using ICPR or other modeling <br />software to determine the various possible solutions to prevent flooding in the area. Finished floor <br />elevations, and garage and site elevations will be analyzed to quantify the protection of private property <br />provided by the improvements in compliance with FEMA CRS guidelines for repetitive loss properties. <br /> <br />We are prepared to work with the City in implementing a value added approach to the project, taking the <br />opportunity to maximize the design effort for project, and provide a phased multi-year construction <br />approach to correct the deficiencies of the entire 1741h Street corridor, including pavement conditions, <br />ADA compliance, improved streetscapping and other general corridor improvements. <br /> <br />We believe that engaging our firm for this project will bring to the City the resources of a multidisplinary <br />firm with 23 years of experience and over 140 professionals and support staff committed to improving <br />the quality of life of the residents of the Winston Towers area and surrounding areas. We look forward to <br />this opportunity to work with City of Sunny Isles Beach on this important project. <br /> <br />Sincerely, <br /> <br />Corzo Castella Carballo Thompson Salman, PA (C3TS) <br /> <br /> <br />.~ <br /> <br />Jorge E. Corzo, E, CFM <br />Founding Principal <br /> <br />901 Ponce de Leon Boulevard, Suite 900, Coral Gables, Florida 33134 <br />www.c3ts.com <br /> <br />305.445.2900 800.448.0227 Fax 305.445.3366 <br />Equal Opportunity Employer <br />