Laserfiche WebLink
<br />, 1 <br />I ) <br />r 1 <br /> <br /> <br />Vr-()ject Vr-()files <br /> <br />PROJECT NAME: <br /> <br />1-95 PUMP STATION <br /> <br />PROJECT ENTITY: <br /> <br />Town of Pembroke Park - Hallandale, FOOT <br />3150 S.W. 52 Avenue <br />Pembroke Park, FL 33023 <br /> <br />, 1 <br /> <br />CONTACT NAME/NO: <br /> <br />Dr. Robert Levy, Town Administrator <br />(954) 966-4600 <br /> <br />PROJECT DESCRIPTION: <br /> <br />FDOT Corridor Drainage Project, 1-95 / Pembroke Park <br />Road. Project includes 84-inch drainage pipes; micro- <br />tunneling; pump station with four (4) pumps (200 HP mo- <br />tors) each capable of 40 CFS; ditch construction and C-10 <br />canal dredging. This project was on a fast track from pre- <br />liminary design to construction; completion took only 25 <br />months. <br /> <br />RESPONSIBILITIES: <br /> <br />Planning, design, permitting, bidding, construction man- <br />agement and construction observation services. <br /> <br />TOTAL BID PRICE: <br /> <br />$10,976,931.00 <br /> <br />PROJECT INITIATION: <br /> <br />October 2000-start of Preliminary Design <br /> <br />PROJECT COMPLETION: <br /> <br />November 2002 - Construction completion <br /> <br />~ Craig A. Smith & Associates <br />ENGINEERS. SURVEYORS. UTILITY LOCATORS. GRANT SPECIALISTS <br /> <br />Proposer: Craig A. Smith & Associates <br /> <br />RFQ No. 11_11_@MIN/PROJECTPROFILES/I-95 PUMP ST A TION-pp02-028.PU~ 5 <br />