My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
Craig A. Smith #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2012 10:46:11 AM
Creation date
2/9/2012 10:18:30 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, 1 <br />'1 <br />'1 <br />~ I <br />, 1 <br /> <br /> <br />V~f)ject V~()files <br /> <br />. 1 <br />I <br />1 . I <br />I <br />I I <br /> <br />. 1 <br /> <br />PROJECT NAME: <br /> <br />KIMBERLY LAKE BASIN DRAINAGE <br /> <br />PROJECT ENTITY: <br /> <br />City of Oakland Park <br />250 N.E. 33 Street <br />Oakland Park, FL 33334 <br /> <br />I I <br /> <br />. I <br /> <br />CONTACT NAME/NO.: <br /> <br />David Womacks, Director of Public Works <br />(954) 561-6280 <br /> <br />. I <br /> <br />PROJECT DESCRIPTION: <br /> <br />The Kimberly Lake area is a private lake surrounded <br />by a multi-family residential development. This pro- <br />ject is to define the contributing basin area, prepare <br />preliminary engineering plans, and to perform pre- <br />liminary drainage analysis and cost estimates for <br />several alternative solutions. <br /> <br />RESPONSIBILITIES: <br /> <br />Provide engineering and surveying services to pre- <br />pare preliminary engineering design analysis and <br />cost estimate for the project. <br /> <br />TOTAL BID PRICE: <br /> <br />$25,400.00 <br /> <br />PROJECT TIME LIMIT: <br /> <br />12 weeks from execution of the work authorization. <br /> <br />PROJECT INITIATION: <br /> <br />December 2001 <br /> <br />PROJECT COMPLETION: <br /> <br />February 2002 <br /> <br />Q <br />Craig A. Smith & Associates <br />ENGINEERS. SURVEORS. UTILITY LOCATORS. GRANTS SPECIALISTS <br /> <br />Proposer: Craig A. Smith & Associates <br /> <br />RFQ No. 11-Ai!nQm/PROJECTPROFILES/KIMBERL YLAKESTUDY -pp02-04 I .pug 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.