Laserfiche WebLink
, 1 <br />'1 <br />'1 <br />~ I <br />, 1 <br /> <br /> <br />V~f)ject V~()files <br /> <br />. 1 <br />I <br />1 . I <br />I <br />I I <br /> <br />. 1 <br /> <br />PROJECT NAME: <br /> <br />KIMBERLY LAKE BASIN DRAINAGE <br /> <br />PROJECT ENTITY: <br /> <br />City of Oakland Park <br />250 N.E. 33 Street <br />Oakland Park, FL 33334 <br /> <br />I I <br /> <br />. I <br /> <br />CONTACT NAME/NO.: <br /> <br />David Womacks, Director of Public Works <br />(954) 561-6280 <br /> <br />. I <br /> <br />PROJECT DESCRIPTION: <br /> <br />The Kimberly Lake area is a private lake surrounded <br />by a multi-family residential development. This pro- <br />ject is to define the contributing basin area, prepare <br />preliminary engineering plans, and to perform pre- <br />liminary drainage analysis and cost estimates for <br />several alternative solutions. <br /> <br />RESPONSIBILITIES: <br /> <br />Provide engineering and surveying services to pre- <br />pare preliminary engineering design analysis and <br />cost estimate for the project. <br /> <br />TOTAL BID PRICE: <br /> <br />$25,400.00 <br /> <br />PROJECT TIME LIMIT: <br /> <br />12 weeks from execution of the work authorization. <br /> <br />PROJECT INITIATION: <br /> <br />December 2001 <br /> <br />PROJECT COMPLETION: <br /> <br />February 2002 <br /> <br />Q <br />Craig A. Smith & Associates <br />ENGINEERS. SURVEORS. UTILITY LOCATORS. GRANTS SPECIALISTS <br /> <br />Proposer: Craig A. Smith & Associates <br /> <br />RFQ No. 11-Ai!nQm/PROJECTPROFILES/KIMBERL YLAKESTUDY -pp02-04 I .pug 1 <br />