My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
Craig A. Smith #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2012 10:46:11 AM
Creation date
2/9/2012 10:18:30 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r 1 <br /> <br />, 1 <br /> <br />cas. <br /> <br />ALBERT J. CARUSO, E.I. <br />Project Manager <br /> <br />RESPONSIBILITIES: Responsible for the design of various components of land development engineering projects <br />including design, calculations, cost estimates and certifications, feasibility studies and phase <br />I environmental site assessments. <br /> <br />EDUCATION: <br /> <br />Middlesex County College, New Jersey <br />Associates Degree in Engineering Technology - 1978 <br /> <br />REGISTRATION: <br /> <br />Engineering Intern New Jersey <br /> <br />EXPERIENCE: <br /> <br />, , <br />I <br /> <br />1997 - Present <br /> <br />Craig A. Smith & Associates, Boca Raton, Florida <br />Project Engineer <br /> <br />- ! <br /> <br />Responsible for working on a variety of projects for Land Development including Walnut <br />Creek and Harbour Lake Estates for Lennar Homes and Walgreens within the City of <br />Tamarac as well as Phase I Environmental site assessments which included twelve sites for <br />the City of Oakland Park Downtown District. Site plan design for AirGlades Industrial Park <br />and City of Okeechobee Industrial Park. Prepared Stormwater Master Plans for the City of <br />Oakland Park, Town of Pembroke Park, City of Lighthouse Point and Village of EI Portal. <br />FEMA grant applications for Town of Pembroke Park and Town of Golden Beach. <br /> <br />, t <br /> <br />Projects include: <br />. Town of Golden Beach Capital Improvement Project, Golden Beach, Florida. Ongoing. <br />Project Manager/Designer of water and stormwater system improvements. <br />. Douglas Park Stormwater Improvements (Phase II), Okeechobee County, Florida. 2008 <br />- ongoing. Design and permitting of stormwater improvements within a low income <br />housing area funded by a CDBG. <br />. Okeechobee County Southwest Drainage Improvements, Okeechobee County, Florida. <br />2008. Design and permitting of stormwater improvements in accordance with the <br />master plan within an area of significant historical flooding concerns. <br />. Ranch Lakes Estates Stormwater Improvements, Glades County, Florida. 2008. Design <br />and permitting of stormwater improvements within an area of significant historical <br />flooding concerns. Improvements included stormwater pumping stations. CAS <br />obtained the FEMA HMGP funding for the project. <br />. NE (/h Avenue Drainage Improvements, City of Oakland Park, Florida. 2005 - 2007. <br />Design and installation of a '/2 mile long (4' x 7' box culvert) stormwater trunkline to <br />serve existing neighborhoods within the City. CAS obtained FEMA PDM grant funding <br />for this project. <br />. Okeechobee County Stormwater Master Plan, Okeechobee County, Florida. 2005- <br />2007. Developed a comprehensive stormwater master plan for the urbanized areas of <br />Okeechobee County and the City of Okeechobee. Problem area identification, H/H <br />modeling, conceptual plan development, conceptual construction costs, and report. <br />. Town of Golden Beach Stormwater Improvements (Phase III & IV), Miami-Dade <br />County, Florida. 2004 - 2006. Design and permitting of stormwater improvements <br />within an area of significant historical flooding concerns. Improvements included <br />stormwater pumping stations. <br /> <br />Proposer: Craig A. Smith & Associates <br /> <br />RFQ No. 11-11-02 <br /> <br />CRAIG A. SMITH <br />& ASSOCIATES <br />43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.