Laserfiche WebLink
<br />'1 <br />1 <br />') <br /> <br />os <br /> <br />MICHAEL D. SARVER, P.S.M. <br />Senior Surveyor <br /> <br />1983 - 1986 <br /> <br />Craig A. Smith & Associates, Pompano Beach, FL <br /> <br />, 1 <br /> <br />Survey crew party chief, performed metes and bounds and sectional lands boundary <br />surveys: work included topographic and hydrographic field operations, field work for <br />production of aerial mapping, condominium documentation, route location and design, <br />subdivision development and commercial and industrial development. <br /> <br />. I <br />I <br /> <br />1978 - 1983 <br /> <br />James F. Nash & Associates, Deerfield Beach, FL <br /> <br />Party Chief of survey crew, performed same duties as listed immediately above. <br /> <br />1976 - 1977 <br /> <br />Glasgow Inc., Clendenin, West Virginia <br /> <br />Party Chief of survey crew, performed construction layout and right of way creation of <br />Interstate 79 through sections of the state of West Virginia. <br /> <br />. J <br /> <br />1975 - 1976 <br /> <br />Lane Construction Company, Clendenin, West Virginia <br /> <br />, J <br /> <br />Party Chief of survey crew, performed same duties as listed immediately above. <br />Construction of interstate highway system through West Virginia. <br /> <br />L 1 <br /> <br />Proposer: Craig A. Smith & Associates <br /> <br />RFQ No. 11-11-02 <br /> <br />CRAIG A. SMITH <br />& ASSOCIATES <br />54 <br />