My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
Craig A. Smith #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2012 10:46:11 AM
Creation date
2/9/2012 10:18:30 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, I <br />, 1 <br />, 1 <br /> <br /> <br />City of T amarac <br /> <br />"Committed to Excellence...Always" <br /> <br />Public Works <br /> <br />, 1 <br />. <br />I <br /> <br />January 18, 2006 <br /> <br />Dear Sir/madam: <br /> <br />" <br /> <br />Craig A. Smith and Associates designed the City of Tamarac's three (3) pump <br />stations with a flow of 35,000 gallons per minute (GPM) for each pump as part <br />of our Stormwater Rehabilitation Project. <br /> <br />At a construction cost of $1.5 million per station, the design of the pump stations <br />consist of the following. <br /> <br />. Stilling Pond <br />. Bar screen <br />. Emergency generator <br />. Axial flow pumps <br />. Telemetry <br />. Head wall into C-14 canal <br /> <br />While the Project Director, William P. Snow, is responsible for the building design <br />and over all project design, the Project Manager, William H. Landis, is <br />responsible for the pump design and Project Engineer, Peter A. Kunen, is <br />responsible for the technical specifications and engineering services during <br />construction. <br /> <br />Construction of the west and central pump stations were completed in December <br />2005. The east pump station is' currently under construction. We are pleased <br />with the finished product and expect to get many years of service from them, <br /> <br />Please feel free to contact me at (954) 597-3701 if you have any questions. <br /> <br />Sincerely, <br /> <br />~~------- <br /> <br />Jack Strain <br />Director of Public Works <br /> <br />Copy: <br /> <br />Alan Lam, Civil Engineer II/Project Manager <br /> <br />Administration (954) 724-2500 . Operations (954) 724-2410 . Engineering (954) 724-2411 <br />6011 Nob Hill Road - Tamarac. Florida 33321-6200 - Fax (954) 724-2428 - www.tamarac.org <br />Proposer: Craig A. Smith & Associates RFd9\;jBI.OfP-~-'b\l Employer 68 <br />
The URL can be used to link to this page
Your browser does not support the video tag.