My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
Craig A. Smith #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2012 10:46:11 AM
Creation date
2/9/2012 10:18:30 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />'1 <br /> <br />· 1 <br />I <br /> <br />qUAUFICATIONS <br /> <br />, 1 <br />I <br /> <br />i I <br /> <br />RELEVANT EXPERIENCE <br /> <br />. Golden Beach Stormwater Improvements Ongoing <br />Contact: Alexander Diaz, Town Manager, Town of Golden Beach <br />Design and permitting of a stormwater retrofit project ($6.0M). Prepared cost estimate, bid <br />schedule, provided bidding assistance and FEMA grant application documentation. <br /> <br />. Stormwater Master Plan and Construction Plans <br />Contact: Alexander Diaz, Town Manager, Town of Golden Beach <br />Prepare a six-phase stormwater master plan and construction plans. <br /> <br />Ongoing <br /> <br />. Stormwater Master Plan and Construction Plans Ongoing <br />Contact: Todd Larson, Public Works Director, Town of Pembroke Park <br />The primary objective of the study was to compile a comprehensive stormwater master plan for <br />the entire Town of Pembroke Park to identify and detmine corrective actions required to resolve <br />existing flooding conditions through best management practices in the development of new and <br />retrofitted stormwater systems. <br /> <br />I I. . <br /> <br />. Stormwater Master Plan and Construction Plans <br />Contact: Manuel Marono, Mayor, City of Sweetwater <br />Prepare a six-phase stormwater master plan and construction plans. <br /> <br />Ongoing <br /> <br />. I <br /> <br />. Phase IV Stormwater Improvements Ongoing <br />Contact: Manuel Marono, Mayor, City of Sweetwater <br />Design and permitting of stormwater retrofit project ($3.8M). Preparation of construction plans, <br />bid schedule, cost estimate, bidding assistance and engineering services for the ongoing <br />construction. <br /> <br />. Phase III & IV of the Stormwater Collection System and Pump Station Master Ongoing <br />Plan & Design <br />Contact: Alexander Diaz, Town Manager, Town of Golden Beach <br />A pumped stormwater collection, treatment and disposal system to serve a portion of the Town <br />of Golden Beach. Phase III & IV pump station design, two (2) submersible pumps each 12 <br />CFS. <br /> <br />. Southwest Drainage Improvements 2011 <br />Contact: Jim Threewits, Deputy Administrator, Okeechobee County <br />Design, permitting, preparation of construction plans, bidding and construction management of <br />a $2.0M stormwater treatment and collection system for the southwest area of Okeechobee <br />County. Assisted County with securing grant and prepared benefit to cost analysis for FEMA <br />HMMGD grant for project. <br />. Stormwater Master Plan 2009 <br />Contact: Jim Threewits, Deputy Administrator, Okeechobee County <br />Stormwater evaluation and master planning study. <br /> <br />. Ranch Lakes Estates Stormwater Improvements, Phase I <br /> <br />2009 <br /> <br />CRAIG A. SMITH <br />& ASSOCIATES <br /> <br />Proposer: Craig A. Smith & Associates <br /> <br />RFQ No. 11-11-02 <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.