Laserfiche WebLink
<br />~1 <br /> <br />r I <br /> <br />1IIIYNi <br />AND ASSOCIATES INC. <br />EHGIN(ERS - PLANIIERS - SURVEYORS <br /> <br />Robayna and Associates, Inc. <br />City of Sunny Isles Beach <br />RFQ No. 11-11-02 <br /> <br />, 1 <br /> <br />Alicia Avila <br />CADD Designer <br /> <br />r 1 <br /> <br />Professional Credentials <br />- BS in Architecture, University of Zulia, Venezuela 1999 <br /> <br />r I <br /> <br />Special Qualifications <br />· 12 Years of experience in technical surveying Computer Aided Design and Drafting and Geometrical <br />Computations. <br />· Experienced in as-built surveying interpretation and preparation of as-built drawings, boundary and <br />topographic surveys, AL T A, Elevation, Construction, Hydrographic and Underwater, sub-division, site <br />plan surveys, etc. <br />· Competent in legal description interpretation and plotting, road right-of-way and easements plans <br />preparation, as well as route surveying drawing preparation. <br />· Ability to complete drawings from a simple sketch and modify existing drawings from your set of red <br />lines. <br />· Detailed attention and care to work. <br /> <br />1 <br />I <br />I ' I <br /> <br />, 1 <br /> <br />. I <br /> <br />, l <br /> <br />Relevant Experience <br />.Mrs. Avila has designed more than a hundred of projects; these are examples of recent relevant projects. <br /> <br />, I <br /> <br />, I <br /> <br />· Needs Assessment Program Various Projects. MDC WASD. SW 681h Ave. to SW 40th St. & S. <br />Waterway Dr.-SW 68th Ave. to SW 6ih Ave. Our firm performed the design phase of this project first. <br />Later in the construction phase we were responsible for all surveying work for Pabon Engineering for <br />the construction of the project with a length of approximately 0.8 miles. Our scope of services included <br />right-of-way determination, route and topographic survey. Elevations, including setting a baseline. <br /> <br />· NW 37th Ave. Area Water & Sewer Improvements - MDC W ASD. - Contract MISC-21, GOB-70267, <br />- This project consisted of route and topographic survey for the engineering design of water <br />distribution and sanitary sewage collection improvements from NW 41st Street to NW 51s1 St. between <br />NW 35th Ave. & NW 36th Ave. <br /> <br />· Greenways Black Trail Segment A. MDC Park and Recreation Dept. -The project consisted of <br />topographic and route survey of approximately 9.10 Miles for SFWMD Canal right-of-way for the <br />enhancement and park pedestrian path engineer design. Perform of a route survey mostly along the <br />Black Creek Canal right-of-way for the purposes of construction a bikeway and multiple recreational <br />use paths. The project extends on both ends into County parks, Black Creek Park in the South and <br />Larry and Penny Thompson Park in the North. <br /> <br />· Federal Correctional Institute. - U.S. Department of Justice Federal Bureau of Prisons F.C.I.-GSA. <br />This project consists of boundary survey of five (5) acre tracts within the Federal Penitentiary and the <br />Gold Coast Rail Road Museum. Preparation of all drawings showing verification and establishment of <br />horizontal control points, geometry and calculations, legal descriptions and sketches of survey. A <br />complete detailed boundary survey was created via CADD to depict new parcel as part of the Federal <br />Penitentiary. <br /> <br />· Government Cut Tunnel Design-Build Criteria Package Survey, Geotechnical and Engineering <br />Services- Fisher Island, FL MDC W ASD. The project consists of right-of-way and easement <br />determination, right-of-way, route and topographic survey from Miami Beach, thru Fisher Island, to <br />Virginia Key and from Fisher Island to the Port of Miami for the purpose of constructing tunnels <br />connecting the water and sewer facilities in this area. Includes extensive GPS surveying with <br />interconnected controls, sub aqueous profiling 0 f Government Cut, Norris Cut and Fisher Cut, as well <br />as surveying of the staging areas for the construction and installation of water mains. <br /> <br />r I <br /> <br />l J <br /> <br />, J <br /> <br />48 <br />