My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Robayna & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
Robayna & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2012 10:44:02 AM
Creation date
2/9/2012 10:41:19 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />r 1 <br />F1 <br />, 1 <br /> <br />November 23, 2011 <br /> <br />, , <br />I <br /> <br />r 1 <br /> <br />Jane Hines, CMC, City Clerk <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, FL. 33160 <br /> <br />, 1 <br />J <br /> <br />RFQ No,11-11-02 Civil Engineering Services to Design Street and Drainage <br />Improvement <br /> <br />.1 <br /> <br />Re: Reference for Robayna and Associates, Inc. <br />Project Name: Venetian Causeway Streetscape Improvements Project <br /> <br />, I <br /> <br />I I <br />J <br /> <br />Dear Jane Hines, CMC, City Clerk: <br /> <br />. I <br /> <br />For the above mentioned project Robayna and Associates, Inc. was the Sub-Consultant <br />for the design of the Venetian Causeway Streetscape Improvements Project No. 662519. <br />Robayna and Associates, Inc. was responsible for the design of the drainage, pavement <br />markings and signing plans for the 1.3 miles of roadway improvements along the <br />Venetian Causeway as well as involved in the design of the structural plans for the <br />island's entry signs, In addition, the firm performed survey of the existing bridge <br />abutments where the proposed drainage outfall pipes will be constructed. The project is <br />currently under construction, The firm is also very involved in post-design services. The <br />personnel has been very accessible at all times to assist in shop drawings review, <br />responses to RFI's and design modification as needed due to filed conditions, <br /> <br />. 1 <br />i --.. <br /> <br />I J <br /> <br />. I <br /> <br />, I <br /> <br />, J <br /> <br />Sincerely, <br /> <br />jCUtct <br /> <br />Lana Moorey, P.E. <br />Project Manager <br />Miami-Dade County Public Works and Waste Management Dept. <br />Highway Division . <br />Plans Review and Design <br />Stephen P. Clark Center <br />111 NW 1 St., Suite 1510 <br />Miami, FI. 33128-1970 <br />Phone: (305) 375-2863 <br />Fax: (305)-679-7738 <br />e-mail: lana@miamidade.gov <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.