My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRS
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
SRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2012 11:05:00 AM
Creation date
2/9/2012 11:01:26 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1 <br />1 <br />1 <br />1 <br />~] <br />~l <br />l <br />~ 1 <br />~ ] <br />! :] <br /> <br />I <br /> <br /> <br />PROJECT NAME: <br /> <br />Various Hialeah <br />Roadway Projects <br /> <br />CLIENT'S NAME: <br /> <br />City of Hialeah <br />Streets Department <br />Mr. Jorge Hernandez <br />(305) 687-2611 <br /> <br />TYPE OF FACILITY <br />OR SERVICES: <br /> <br />Hialeah Roadway and <br />Drainage Improvements <br /> <br />SRS PROJECT FEE: <br /> <br />$3,618,168 <br /> <br />COMPLETION DATE: <br /> <br />2001 thru 20010 <br /> <br />I r 1 <br />l 1 <br /> <br />KEY INDIVIDUALS Ignacio Serralta, P,E, <br />INVOLVED: Oliverio Sanchez, P.E. <br />Jean-Claude Fontaneau <br />PROJECT DESCRIPTION: <br />SRS provided engineering design, preparation of <br />construction documents, permitting assistance, <br />and pre-construction phase support services to <br />the City of Hialeah for the reconstruction of over <br />26 miles of existing roadways, including the <br />preparation of designs for the construction of <br />drainage improvements associated with the <br />roadway reconstruction. Our work included <br />meeting with City of Hialeah staff and local <br />regulatory agencies to establish design guidelines, <br />conduct a utility search and identification of <br />existing utilities, existing traffic controls, and <br />review roadway design standards, We also <br />designed and prepared the construction <br />documents for the project. This work included the <br />preparation of summary of quantities, signage <br />and marking plans, signage and marking <br />quantities, MOT plan, specifications, and <br />engineer's estimate of probable construction cost. <br />SRS also performed pre-construction support <br />services, which included attending pre-bid <br />meeting, responding to pre-bid request of <br />information, and review of bids, This also included <br />providing supplemental information and/or <br />clarification of construction documents to <br />prospective bidders during the bid solicitation <br />process, review bid submittals, attend bid- <br />opening meeting, and provide construction <br />inspections as needed, (SRS was Prime <br />Consultant) <br /> <br />, I <br />Id <br /> <br />r 1 <br /> <br />I J <br /> <br />f I <br />I <br /> <br />" J <br /> <br />. J <br /> <br />l J <br /> <br />l J <br /> <br />l J <br /> <br />, J <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.