My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRS
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
SRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2012 11:05:00 AM
Creation date
2/9/2012 11:01:26 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1 <br />1 <br />rl <br />1 <br />~l <br />] <br />l <br />~ I <br />I ~] <br />! ') <br />I l <br /> <br /> <br /> <br />: J <br /> <br /> <br />PROJECT NAME: <br /> <br />Chapman Field Park <br />New Pedestrian/Bike <br />Paths and Parking Lot <br /> <br />CLIENT'S NAME: <br /> <br />Miami-Dade County <br />Park & Recreation <br />Department <br />Ms. Lydia Salas <br /> <br />TYPE OF FACILITY <br />OR SERVICES: <br /> <br />Pedestrian/Bike Path, <br />Access Road, Canoe <br />Ramp, and Parking Lot <br /> <br />SRS PROJECT FEE: <br /> <br />$55,818 <br /> <br />COMPLETION DATE: <br /> <br />September 2011 <br /> <br />KEY INDIVIDUALS <br />INVOLVED: <br /> <br />Ignacio Serralta, P,E, <br />Oliverio Sanchez, P.E. <br />Jean-Claude Fontaneau <br /> <br />PROJECT DESCRIPTION: <br /> <br />, I <br />l I <br /> <br />SRS provided the engineering design, permitting <br />and construction phase services of a <br />pedestrian/bike path, access road, parking area, <br />and canoe ramp. The project is located within <br />Chapman Field Park from Old Cutler Road to <br />approximately 3f4 mile east into the park. The <br />work included the geometric design of the <br />pedestrian/bike paths and parking lot, design site <br />paving, grading, and drainage plans. <br />Coordinating the work with other subconsultants <br />including Surveyors, Geotechnical, Structural <br />Engineers and environmental consultants. Our <br />scope of work also included preparing and <br />submitting permit applications and construction <br />plans for "dry-run" and "final" review by local <br />regulatory agencies including Miami-Dade County <br />Building Department, Miami-Dade Public Works <br />Dept., and DERM; as well as, Environment <br />Resources Permit (ERP) for costal construction <br />and impacts to wetlands and mangroves, <br /> <br />, 1 <br /> <br />l J <br /> <br />l J <br /> <br />~ <br /> <br />, j <br /> <br />Construction Phase services included weekly <br />construction meetings, reviewing shop drawings, <br />responding to RFI's, providing periodic <br />construction observations, and preparing close- <br />out documents. <br /> <br />, J <br /> <br />.. J <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.