|
<br />l
<br />
<br />~l
<br />
<br />ea~w--,-
<br />, .1'/.. 'lo ... .... a
<br />, ~ i '1!.t.
<br />
<br />
<br />l
<br />
<br />VLADIMIR MELGUIZOVSKI, E.I.
<br />PROJECT ADMINISTRATOR I SENIOR INSPECTOR
<br />(11 YEARS OF EXPERIENCE)
<br />
<br />~l
<br />
<br />DEGREES AND AFFILIATIONS:
<br />
<br />~ )
<br />
<br />Bachelor of Science in Civil Engineering, Javeriana University
<br />Master of Science in Construction Management, Javeriana University
<br />
<br />LICENSES AND CERTIFICATIONS:
<br />
<br />~ I
<br />
<br />Licensed Engineer Intern, State of Florida No, 1100008838
<br />CTQP Tin No, M422298594700, Asphalt Paving Levell & II, Earthwork Levell & II, Concrete Level 1 , Drill Shaft, Pile Driving,
<br />QC Manager, Final Estimates Level 1
<br />
<br />~ I
<br />
<br />OTHER TRAINING:
<br />
<br />ACI Concrete, FOOT MOT, Radiation Safety
<br />
<br />: I
<br />
<br />EXPERIENCE:
<br />
<br />~ ]
<br />
<br />JUNE 2011 TO SEPTEMBER 2011
<br />PA/Senior Inspector on the $635,000.00 Water Main project in the North Shore area of Miami Beach from 85 Street to 73
<br />Street Along Byron Ave, Tatum Waterway and Dickens Road, This watermain was constructed with a residential community
<br />and involved Roadway restorations,
<br />
<br /><1
<br />I ' 1
<br />II I
<br />
<br />FEBRUARY 2010 TO MARCH 2011 Sr. Inspector for Seminole Tribe of Florida Snake Road and Bridge Project
<br />Reconstruction of BIA Route 1281 bridge approaches and utilities, a $2.3 million reconstruction project. Director of
<br />Transportation: Richard Pereira (954) 985-2300
<br />
<br />NOVEMBER 2009 TO FEBRUARY 2010 Construction Inspector for City of Fort Lauderdale, Fire Stations #29, #49, and #3.
<br />Responsible for daily documentation of construction activities, materials testing, foundations structures and site work.
<br />
<br />r 1
<br />I I
<br />
<br />APRIL 2009 TO OCTOBER 2009 Construction Inspector for US-1 Project in Vero Beach, FL. for FOOT District IV which
<br />includes milling and resurfacing, widening, lighting and signalization improvements. FOOT Project Administrator: Kristopher
<br />Kehres (772)618-3761
<br />
<br />I I
<br />I I
<br />
<br />JANUARY 2006 TO OCTOBER 2007 Assistant Project Manager / Cost Engineer providing support to the Senior Project
<br />Manager in managing and controlling various projects on $2.7 Billion North Terminal Development Program at Miami
<br />International Airport, Managed construction changes including reviewing contractor proposals, prepared change/work orders,
<br />coordinated negotiation meetings and construction meetings, reviewed pay applications and schedule of values.
<br />
<br />I 1
<br />
<br />MARCH 2005 TO DECEMBER 2005 Senior Roadway / Bridge Inspector on the SR-9 (Interstate 1-95) reconstruction from
<br />12th Avenue South to 10th Avenue North in Palm Beach County, FL. Responsible for implementation of the Contractor's
<br />quality control plan for all asphalt, concrete and earthwork construction on the project in conformance with section 105 of the
<br />FOOT specifications. Level II technician working for the Contractor responsible for sampling, testing and acceptance of all
<br />concrete construction including bridge substructures and superstructures and supervised CQC staff, Level 1 technician
<br />performing earthwork/embankment testing. Additionally, supervised all asphalt construction behind the pavers,
<br />
<br />l J
<br />
<br />;
<br />. I
<br />
<br />JANUARY 2003 TO FEBRUARY 2005 Roadway Inspector for the Miami-Dade Department of Environmental Resource
<br />Management (DERM) Drainage Cleanup Program, Supervised several Contractors performing pipe desalting and storm
<br />sewer system clean up operations all throughout Miami Dade County. Documented all work accomplished daily to verify
<br />contractors invoices, ensured all drainage systems were effectively functioning after task completion and assisted Senior
<br />Inspector in other duties.
<br />
<br />L I
<br />
<br />I
<br />I
<br />. I
<br />
<br />JUNE 2001 TO DECEMBER 2002 Senior Inspector on 1-95 sound wall project from SR 112 to Broward County Line,
<br />This project also included Concrete Pavement Construction,
<br />
<br />, J
<br />
<br />Resume of Vladimir Melguizovski
<br />
<br />Page 1 of 2
<br />
<br />I
<br />
<br />, I
<br />
|