My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2012 2:12:13 PM
Creation date
2/9/2012 2:09:32 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />J <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />) <br />) <br />) <br />~ ) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br /> <br />INDIAN TRACE DEVELOPMENT DISTRICT <br />STORMWATER MANAGEMENT MASTER PLAN <br />Weston, Florida <br /> <br />l:~ <br />.. -"'" <br /> <br /> <br />fj~?"!IJ!l1[t'V <br /> <br />6l;; .. <br /> <br />'.1:1 <br /> <br />'" - <br /> <br />-~~I, ij~"""" <br />. 0 ~-* ii.~'l'~\l!wrrt <br /> <br />The Indian Trace Development District (ITCDD), a dependent district of the City of <br />Weston, consists of 2,245 acres of interconnected lakes and wetlands discharging into <br />the South Florida Water Management District (SFWMD) C-ll West Canal. The water <br />quality and discharge rates are controlled by the two large storm water pump stations <br />on the southern boundary of the community. <br /> <br />Phase I of the Storm Water Master Plan identified the hydraulic and the hydrologic <br />characteristics of the study area. This data was then compared to the previously <br />permitted information and discrepancies were identified and rectified through use of <br />the existing GIS database. This information provided a more refined level of accuracy <br />than was used to obtain the previous permits. In addition, CGA verified existing data <br />using a G,P.S. Survey Crew, This model has been used as a basis for evaluation of all <br />proposed development within the District. <br /> <br />The model provided a base line from which the City's Level of Service (LOS) was <br />determined. Additionally, the model identified weaknesses in the conveyance system, <br />flood conditions due to an insufficient volume of storage and unacceptable localized <br />flood durations within the District boundary. Improvements to the system were <br />incorporated into the model and their effect on the performance of the system <br />evaluated. <br /> <br />From this CGA developed a prioritized list of necessary improvements, including <br />projected cost, for inclusion in the City's Capital Improvement Plan. <br /> <br />11-4620 Drain Indian Trace Dev. District <br /> <br />Client <br />City of Weston <br /> <br />Contact information <br />at time of project: <br /> <br />John R. Flint <br />City Manager <br />17200 Royal Palm Blvd <br />Weston, Florida 33326 <br />(954) 385-2000 <br /> <br />Project Date <br />1995 - Present <br /> <br />Services Provided <br /> <br />Engineering <br />Surveying <br />Permitting <br />Construction Management <br /> <br />Principal in Charge <br />Dennis J. Giordano <br /> <br />Project Manager <br />John Messerian, PE <br /> <br />Team Members <br /> <br />Douglas R. Taylor, PE <br />Robert McSweeney, PE <br /> <br />Firm's Role <br />Prime <br /> <br />Construction Cost <br />$8,500,000 <br /> <br />Consulting Cost <br />$510,000 <br /> <br />Page 218 <br />
The URL can be used to link to this page
Your browser does not support the video tag.