Laserfiche WebLink
<br />, <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />~ <br />) <br />) <br />) <br />t- ) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />-4 - <br />I <br />I <br /> <br /> <br />MANATEE ISLES DRIVE ROADWAY IMPROVEMENTS <br />Weston, Florida <br /> <br /> <br />Manatee Isles Drive is a two lane divided roadway, with turn lanes, in a residential area, <br />connecting several neighborhoods to an elementary school on the east end and Florida <br />Nature and Cultural Center on the west end. This project included the design of <br />improvements to Manatee Isles Drive between SW 196TH Avenue and South Post Road. <br />The project added bicycle lanes, sidewalk, street lighting, drainage improvements, curb <br />and gutter and improved school zone markings at Manatee Bay Elementary School. CGA <br />also provided the necessary design survey and construction management services. <br /> <br />11-4620_ Manatee Isles Improvement Proj <br /> <br />Client <br />City of Weston <br /> <br />Contact information <br /> <br />Jeff Skidmore <br />Assistant City Manager <br />Saddle Club Road <br />Weston, Florida 33326 <br />(954) 385-2000 <br />(954) 385-2010 (Fax) <br /> <br />Project Date <br />2008 - 2010 <br /> <br />Services Provided <br /> <br />Construction Management <br />Electrical Engineering <br />Roadway Design <br />Survey & Mapping <br />Traffic Engineering <br /> <br />Principal in Charge <br />Dennis J. Giordano <br /> <br />Project Manager <br />Ray Pippitt, PE <br /> <br />Team Members <br />Douglas Taylor, PE <br />Jenna Chamberlain, PE <br />Bob Jackson, PSM <br />Jeff Maxwell, PE, PTOE <br />Sabrina Baglieri <br />Bob Roush, PE <br /> <br />Eng. Cost Estimate <br />$1,811.762 <br /> <br />Initial Construction Cost <br />$1,548,985.00 <br /> <br />Change Orders <br />o <br /> <br />Final Cost <br />$1,548,985.00 <br /> <br />CGA Fees <br />$202,146.00 <br /> <br />Page 2111 <br />