My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2012 2:12:13 PM
Creation date
2/9/2012 2:09:32 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />I <br />-1 <br /> <br /> <br />"If Calvin. Giordano ~ Associates, Inc. <br />lEXCEPTIONAL SOLUTIONS <br /> <br />. <br /> <br />Robert Jackson, PSM, Page 2 <br /> <br />with conventional sub-traverses utilized for finding or setting property corners and locating <br />improvements. At the completion of the AUTOCAD drawing all aspects of the project were reviewed for <br />completeness and compliance with Minimum Technical Standards (MTS). <br /> <br />Dania Cove, Dania Beach, Florida. Prepared a Boundary and Topographical survey which delineated <br />mean high water along the Dania Cut-Off Canal. All in accordance with the State of Florida minimum <br />technical standardslor lano surveys as oefinecfbYCnapter 5J-17.05ofthe Florida Administrative-Code. <br /> <br />City of Lauderhill, Florida, Storm Water locations-GPS. Project Manager responsible for all survey <br />aspects of this project. Project involved locations of catch basins and outfalls with the Global Positioning <br />System (GPS). Performed quality control throughout the project. Coordinated weekly meetings to assure <br />the project was on time and on budget. <br /> <br />City of Weston, Florida, Sign Inventory-GPS (City of Weston Surveyor). Project Manager responsible <br />for all survey aspects of this project. Project involved locations of City sign age. This included informational <br />signs and all traffic signs throughout the City. Survey Crews cataloged, height, type of sign and condition <br />with the Global Positioning System (GPS). Performed quality control throughout the project. Coordinated <br />weekly meetings to assure the project was on time and on budget. <br /> <br />City of Weston, Florida, Storm Water Improvements-GPS. Project Manager responsible for all survey <br />aspects of this project. Project involved locations of catch basins and outfalls with the Global Positioning <br />System (GPS). Performed quality control throughout the project. Coordinated weekly meetings to assure <br />the project was on time and on budget. <br /> <br />Page 3123 <br />
The URL can be used to link to this page
Your browser does not support the video tag.