Laserfiche WebLink
<br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />I <br />-1 <br /> <br /> <br />"If Calvin. Giordano ~ Associates, Inc. <br />lEXCEPTIONAL SOLUTIONS <br /> <br />. <br /> <br />Robert Jackson, PSM, Page 2 <br /> <br />with conventional sub-traverses utilized for finding or setting property corners and locating <br />improvements. At the completion of the AUTOCAD drawing all aspects of the project were reviewed for <br />completeness and compliance with Minimum Technical Standards (MTS). <br /> <br />Dania Cove, Dania Beach, Florida. Prepared a Boundary and Topographical survey which delineated <br />mean high water along the Dania Cut-Off Canal. All in accordance with the State of Florida minimum <br />technical standardslor lano surveys as oefinecfbYCnapter 5J-17.05ofthe Florida Administrative-Code. <br /> <br />City of Lauderhill, Florida, Storm Water locations-GPS. Project Manager responsible for all survey <br />aspects of this project. Project involved locations of catch basins and outfalls with the Global Positioning <br />System (GPS). Performed quality control throughout the project. Coordinated weekly meetings to assure <br />the project was on time and on budget. <br /> <br />City of Weston, Florida, Sign Inventory-GPS (City of Weston Surveyor). Project Manager responsible <br />for all survey aspects of this project. Project involved locations of City sign age. This included informational <br />signs and all traffic signs throughout the City. Survey Crews cataloged, height, type of sign and condition <br />with the Global Positioning System (GPS). Performed quality control throughout the project. Coordinated <br />weekly meetings to assure the project was on time and on budget. <br /> <br />City of Weston, Florida, Storm Water Improvements-GPS. Project Manager responsible for all survey <br />aspects of this project. Project involved locations of catch basins and outfalls with the Global Positioning <br />System (GPS). Performed quality control throughout the project. Coordinated weekly meetings to assure <br />the project was on time and on budget. <br /> <br />Page 3123 <br />