My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
CES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2012 3:01:54 PM
Creation date
2/9/2012 2:20:33 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />l <br /> <br />(0) <br /> <br />Consulting Engineering & Science, lnc, <br /> <br />') <br /> <br />Client Name: Miami-Dade County Park & Recreation Department <br />Guillermo "Willy" Pena, Construction Manager <br /> <br />Address: <br /> <br />275 N,W. 2nd Street, 4th Floor, Miami, Florida 33128 <br /> <br />} <br /> <br />Client Phone: (305) 755-7914 <br /> <br />E-mail: williep@miamidade,gov <br /> <br />Description of scope of the work: <br /> <br />\ <br />') <br /> <br />Black Point Park & Marina <br />Miami-Dade County <br /> <br />() <br /> <br />The project included the implementation of a park-wide sewage collection and transmission <br />system; specifically including the removal of a number of septic tanks and drainfields; and, <br />installation of a sewage collection and transmission system consisting of about 1,500 linear feet <br />of gravity sewer main; one (1) sewage pump station with 1,000 linear feet of 2-inch force main <br />connecting a remote restroom facility to the gravity system; and, one (1) sewage pump station <br />with 1,200 linear feet of 6-inch force main and 1,000 linear feet of 8-inch sewage force main <br />extension which then connected to existing County sewer facilities. <br /> <br />Month and Year the project was started and completed: Design Start: 2001; Design <br />Completion: 2005; Construction Start: 2007; Construction Completion: 2009, <br /> <br />Role of Firm and Responsibilities: <br /> <br />J <br /> <br />Under contract to Miami-Dade County Park & Recreation Department, Consulting Engineering & <br />Science, Inc, served as prime consultant for the design, preparation of construction documents, <br />permitting and construction administration services for this project. Unique features of this <br />project included maintaining all facilities in service throughout construction, including a <br />restaurant; a force main aerial canal crossing; and, right-of-way permitting of the work with the <br />South Florida Water Management District. - <br /> <br />City RFP No, 11-11-02 <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.