My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
CES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2012 3:01:54 PM
Creation date
2/9/2012 2:20:33 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />., <br /> <br />., <br /> <br /> <br /> <br />3501 North Ocean Drive <br />Hollywood, FL 33019 <br /> <br />(954) 922.6491 <br />Fax (954) 922-8988 <br /> <br />i) <br /> <br />Augl1~s_t_2_8_, 2009 <br /> <br />Re: Letter of Reference <br />positano Condominium <br />Hollywood, Broward County <br /> <br />,) <br /> <br />To Whom It May Concern: <br /> <br />This letter is being written at the request of Consulting <br />Engineering & Science, Inc. to provide a letter of reference in <br />association with their work on the above referenced project. <br /> <br />I ') <br /> <br />I ) <br /> <br />The Positano Condominium was a three phase project situated between <br />the Atlantic Ocean and the Intracoastal Waterway, within a major <br />redevelopment area in the City of Hollywood. The project included <br />a new luxury condominium building adjacent to the Hollywood public <br />boardwalk; renovation of a marina complex along the Intracoastal <br />Waterway; and, a new low rise residential/office complex. <br /> <br />Consul ting Engineering & Science, Inc. \vas the C:;i vil/Site and <br />Coastal engineering consultant for these projects. Their <br />responsibilities included the planning, permitting and design of <br />the site improvements; and, the planning, environmental permitting <br />and design of the marina renovations. Civil/Site/Coastal design <br />fees for this project were over $300,000; and, the total <br />construction cost was over $50 million. Design work began in 2002 <br />and construction was generally completed in 2008. <br /> <br />Consulting Engineering & Science, Inc~s participation in this <br />project has been a major factor in its success. Their ability to <br />deal with a multitude of regulatory agencies; and, their knowledge <br />and understanding of Federal, State and local environmental <br />regulatory issues were paramount. Their performance has been more <br />than satisfactory; and, we look forward to working with them again <br />in the future. <br /> <br />Sincerely, <br /> <br />LOJETA GROUP OF FLORIDA, LLC. <br /> <br />-~ <br />c=:-----< <br />Lon J. Tabatchnick <br />LJT/el <br /> <br /> <br />City RFP No, 11-11-02 <br /> <br />30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.