Laserfiche WebLink
<br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />CITY OF SUNNY ISLES BEACH RFQ NO. 11-11-02 <br />CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS <br /> <br />ADOLFO A. GONZALEZ, P.E., LEED AP <br />Project Manager - Senior Supervising Engineer <br /> <br />Mcintosh Road, Port Everglades - Civil Engineer of Record. Broward County <br />selected Craven Thompson & Associates (CTA) to optimize truck queuing to the <br />container yards in the South port area. Tasks included traffic and road realignment <br />studies, surveying, transportation and geotechnical engineering, and construction <br />administration services related to the expansion of the Mcintosh Road corridor <br />from an existing 4-lane divided urban collector to 6-8 lane divided urban collector <br />with dedicated storage lanes for each container yard. The project included <br />evaluating several alignment options to decrease delay and travel times, vehicle <br />emissions and total fuel consumption. CTA designed enhanced driveway <br />connections to each container yard with overhead illuminated way-finding signs to <br />guide truck traffic along the dedicated storage lanes thereby freeing up the <br />through lanes. The engineering services include storm water management design <br />and permitting and an evaluation of alternative methods for accommodating new <br />roadway construction over organic materials. CTA has completed the design for <br />the project and construction is anticipated to begin in Winter 2011. The estimated <br />construction cost is $8.4 Million. <br /> <br />Calder Casino, Miami Gardens, Florida - Civil Engineer Project Manager / Engineer <br />of Record. Construct 110,000 SF building at an existing site. Challenges included <br />coordinating an off-site water main extension through WASD and creating a <br />separate storm water management system for new building and parking lots <br />without impacting existing drainage facilities. <br /> <br />Children's Reading Center and Museum, Davie, Florida - Civil Engineer Project <br />Manager / Engineer of Record. Construct new 68,461 SF building designed for a <br />lEED Gold rating. Challenges included maximizing site layout while avoiding wide <br />existing easements, coordinating off-site driveway connections with Town of <br />Davie, and securing variances from the Central Broward Water Control District. <br /> <br />Stranahan High School, Phased Replacement, Fort lauderdale, Florida - Civil <br />Engineer Project Manager / Engineer of Record. Construct new 246,000 SF high <br />school complex in 4 phases while maintaining existing school campus operation <br />until last phase. Provided civil engineering design and lEED site planning to <br />architect. Challenges included keeping existing water/sewer/drainage <br />infrastructure operational while constructing new facilities. *The project was <br />deferred indefinitely by Broward County School Board at the 50% CD stage due to <br />funding constraints. <br /> <br />Oakridge Elementary School, Concurrent Replacement, Hollywood, Florida - Civil <br />Engineer Project Manager / Engineer of Record. Construct 104,000 SF multi-story <br />classroom building, food service building and ancillary buildings in 2 phases while <br />maintaining existing campus operational. Challenges included layout of temporary <br />staging areas and utilities to avoid disruptions to existing school operations. *The <br />project was deferred due to funding constraints. <br /> <br />CRI>lJEN lHOMPSON <br /> <br />tJ <br /> <br />CRAVEN THOMPSON & ASSOCIATES, INC. <br />ENGINEERING - SURVEYING - LANDSCAPE ARCHITECTURE - PLANNING <br /> <br />/I ASSOCIp,JES 1Ne. <br /> <br />3112 <br />