Laserfiche WebLink
<br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />CR~EN lHOMPSON <br /> <br />(jJ <br /> <br />& ASSOCII'JES INC <br /> <br />CITY OF SUNNY ISLES BEACH RFQ NO. 11-11-02 <br />CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS <br /> <br />DON SHAVER <br />Director of Construction Services <br /> <br />Project Manager (1983 - 1987, Broward County Airport Expansion Office, Fort <br />lauderdale/Hollywood Int'l Airport - Involved in the $262 million fast-track <br />Expansion Program. Took several projects from the design stage through the <br />procurement process to successful close-outs. Projects included surface auto <br />parking lot, parking garage, entrance road construction, fuel farm, terminal <br />building, aircraft parking apron. Coordinated airline representatives, consultants, <br />and contractors to resolve issues on a daily basis during construction phases. <br /> <br />Construction Manager (1981-1983)-Phillips Petroleum Company, Bartlesville, OK <br />Represented Owner on Pier 66 Hotel Renovations and Addition in Fort lauderdale, <br />Florida. Coordinator of construction between managers, trade contractors and <br />consultants for $40 million dollar renovation. <br /> <br />RELEVANT EXPERIENCE <br /> <br />South County Neighborhood Improvement Project, Broward County - <br />Responsible for construction management of Broward County's South County <br />Neighborhood Improvement Project. Project consists of twelve construction <br />packages with a total construction cost of approximately $60 million dollars. <br />Improvements include water distribution, sanitary sewer, lift stations, force main, <br />storm water improvements and roadway construction. <br /> <br />Miramar Regional Park - Phase 1, Miramar - Responsible for Construction <br />Management for construction of an $8.8 million Regional Park. The project <br />consists of soccer fields, cricket fields, concession and restroom buildings, <br />corporate pavilions, playground areas and the installation of water distribution <br />system, sanitary sewer system, storm water improvements, roadways and parking <br />lot construction. <br /> <br />N.E. 38th Street Roadway Improvements, Oakland Park - Responsible for <br />Construction management for construction of N E 38th Avenue from NE 12th <br />Avenue to Federal Highway. Project consists of storm water system, water <br />distribution system and roadway re-construction. Construction cost is $3.3 million. <br /> <br />Green Acres Municipal Complex, Green Acres - Responsible for Construction <br />Management of construction of the infrastructure for City Hall and Public Works <br />Facility. The project consists of installation of water distribution, sanitary sewer <br />system, lift station, storm water system and roadway and parking lot. <br /> <br />Oaks at Hidden Harbor, Dania Beach - Responsible for construction management - <br />Cost: $10 Million. Design and permitting of an 8 acre - 55 unit multi-family <br />development along the Dania Cut-off Canal. Design included water, sewer, and <br />drainage facilities and well as an off-site sewer extension. <br /> <br />Southport Phase VII and VIII, Broward County - Responsible for construction <br />management of Port Everglades South port Container Yard Project. The total <br />construction cost for Phase VII and VIII of approximately $12 million dollars. <br />Improvements include water distribution, sanitary sewer, storm water <br />improvements and container yard construction. <br /> <br />CRAVEN THOMPSON & ASSOCIATES, INC. <br />ENGINEERING - SURVEYING - LANDSCAPE ARCHITECTURE - PLANNING <br /> <br />3129 <br />