My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C H PEREZ
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
C H PEREZ
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2012 3:44:25 PM
Creation date
2/9/2012 3:38:58 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
CVS
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />~ l <br />) <br />) <br />) <br />) <br /> <br />REQUEST FOR QUALIFICATIONS <br />RFQ No.: 11-11-02 <br /> <br />CITY OF SUNNY ISLES BEACH <br />CIVIL ENGINEERING TO DESIGN STREET <br />AND DRAINAGE IMPROVEMENTS <br /> <br />Client: Metric Engineering, Inc., FOOT, District 4 / Reference: Martin Marquez, PE (305) 235- <br />5098. This project included all the necessary surveying and right-of-way mapping required to <br />develop construction plans for a RRR project. <br /> <br />O. t' 'd P hb tt M' O' c 105/2004-1 <br />IS nctwl C us u on mOl' cSlgn ontract 108/20071 <br /> <br />Client: A&P Consulting Transportation Engineers / FDOT, District 6 Traffic Operations Office / <br />Reference: Omar Meitin, PE (305) 470-5312. Mr. Perez served as the project manager for this <br />contract since it was awarded, over 88 work orders have been completed through it including a <br />ide range of minor design projects as well as two projects with a construction cost of over $1.5 <br />Million. <br /> <br />A. 'tl D' 1 'I" A St 1 . M' . D 1 I Me' l05/2004-1 <br />mCl'lcans WI 1 Isa)J ItICS ct lJ( y m mnll- a( C am onroc ountIcs 112120051 <br /> <br />Client: A&P Consulting Transportation Engineers / FDOT, District 6 Public Transportation <br />Office / Reference: Akhtar "Ike" Mahmood, PE (305) 470-5166. Mr. Perez served as the project <br />anager for this contract since it was awarded in 2001. A comprehensive study to asses ADA <br />compliance in the State Highway System within the District was completed and used as <br />reference for developing scope of future improvements within the District. <br /> <br />Media Relatiolls Group LLe, Illc. <br /> <br />Town of Cutler Bay Public Outreach Contract 2008 <br />Town of Cutler Bay <br /> <br />MRG served as an extension of the Town's staff to the community. MRG established the branding <br />and developed the text for the town's newsletters, assisted in the coordination and media pitching <br />of the Founders Day celebration, as well as working with media outlets to handle inquiries and <br />story ideas. MRG was also responsible for attending Town Council meetings and creating flyers <br />for Town Council open houses, a Town bike ride and the first State of the Town address. <br /> <br />North Bay Village aste Water Force Main Replacement Project 2010- <br />North Bay Village 2011 <br /> <br />MRG was responsible for creating a Public Involvement Plan (PIP) to best reach motorists, <br />edestrians and interested parties to keep them informed during the construction process. MRG <br />assigned a Public Information Specialist (PIS) to address the concerns of the community and to <br />serve as the daily point of contact on behalf of the contractor. Through the process of direct <br />ailings and door-to-door distribution, fliers were distributed along the corridor to residents and <br />he business community, and e-mail blasts have provided residents regular updates on all related <br />construction activities. <br /> <br /> <br />826 836 Interchange Reconstruction Project 2010- <br />Florida Department of Transportation Public Transportation Office-District VI 2011 <br /> <br />MRG oversees all public information strategy and is responsible for managing the production 0 <br />all collateral materials and for overseeing website conception, development and execution. MR <br />staff has attended various group progress meetings and continues to work with the entire project <br />earn to develop an overall effective, cohesive marketing/public involvement campaign. <br /> <br />C H Perez & Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.