Laserfiche WebLink
<br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />Derrick CLewis, PE <br /> <br />Senior Project Manager / Stormwater Management <br />dcl@p-a.cc <br /> <br />9594 NW 41" Street <br />Suite 201 <br />Doral, FI 33178 <br />Tel: 305.592.1070 <br />Fax: 305.592.1078 <br /> <br />~~~ <br /> <br />C H Perez & Associates <br />Enginoors. Plon"ors . SurvOVOf5 <br /> <br />Professional Registration: <br />Florida Professional Engineer No. 62965 <br />Education: <br />Bachelor of Science in Civil Engineering, University Central Florida <br />Master of Science in Civil Engineering, Florida International University <br />Years of Experience: 14 <br />Project Specific Experience: <br />CH Perez &. Associates, Inc <br />Stormwater Management Project Manager <br /> <br />Keith &. Schnars, PA, FT. Lauderdale Florida <br /> <br />2004 <br /> <br />2006 <br /> <br />November 2010 to Present <br /> <br />February 2007 to November 2010 <br /> <br />S.W 157th Ave Reconstruction Miami-Dade County, FL 8/2007 to 10/2010 <br /> <br />Senior Project Manager for Stormwater Management, This project included reconstruction of 2 miles of <br />roadway improvements. In addition, 2 miles of exfiltration design, which involved coordination and interaction <br />with D.E.R.M and SFWMD. Client PM:, Raul Quintela, PE, 305.375-3971 <br /> <br />CrossTown Parkway, PD&E Port St. Lucy County, 12/2008 to 1/2010 <br /> <br />Senior Project Manager for Stormwater Management for the Crosstown Road Way and River Crossing <br />Extension, Port St, Lucie County: Principal Drainage Engineer responsible for instituting a comprehensive <br />Storm-Water management strategy for the PD&E phase for 6 river crossing alternative for a fragile wetland <br />ecosystem, this included providing a preliminary drainage report, A pond siting report, location hydraulic report <br />and Bridge Hydraulic report. This includes extensive coordination and interaction with SFWMD, FDEP, Coast <br />Guard and a host of federal and local agencies. <br />Client PM: Patricia Roebling, P.E. 772-871-5174 <br /> <br />Florida Department of Transportation District VI, Miami, Florida <br />January 1998 to February 2007 <br /> <br />N.W/N.E. 36th ST (SR 25) Reconstruction, Miami-Dade County (FPID No. 249528-1-52-01), (FDOT 6) <br />11/200 to 12/2002 <br /> <br />.Drainage Engineer responsible for drainage design, permitting, plan production hydraulic modeling and report <br />writing of the drainage report of over 2 miles of SR 25 roadway widening and reconstruction improvements. <br />Project included 30 deep wells which involved coordination and interaction DERM, FDEP and SFWMD. <br />Client PM: Bayo Coker, PE, 305.470.5200 <br /> <br />Biscayne Blvd (SR 5) Reconstruction & Pump Station, Miami-Dade County, (FDOT 6) (FPID No. <br />249835-2-52-01) <br /> <br />Project Lead Drainage Engineer responsible for drainage design, permitting, plan production hydraulic modeling <br />and repoli writing of the drainage repoli of over 2 miles of SR 5 roadway widening and reconstruction <br />improvements. Project included Pump station design 30 deep wells which involved coordination and interaction <br />DERM, FDEP and SFWMD. Client PM: Yuanet Letzelter,P.E. 305-4705200 <br /> <br />Biscayne Blvd (SR 5) Reconstruction from N.E 67 to N.E. 87, Miami-Dade County, (FDOT 6) (FPID No. <br />405641-2-52-01) <br />Drainage Engineer responsible for drainage design, permitting, plan production hydraulic modeling and report <br />writing of the drainage report of over 1.5 miles of SR 5 roadway widening and reconstruction improvements. <br />Project included over 30 deep wells and French Drain design which involved coordination and interaction DERM, <br />FDEP and SFWMD. Client PM: Mohammed Mansuri, P.E., 305-4705200 <br /> <br />Engineers So. Surveyors dedicated to Transportation Development and Operations <br /> <br />Page 1 of 1 <br />