Laserfiche WebLink
<br />) <br />) <br />) <br /> <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />I I <br /> <br />Leticia V. Perera, PE <br /> <br />Senior Highway Engineer / Project Manager <br />Ivp@lD-a.cc <br /> <br />9594 NW 41" Street <br />Suite 201 <br />Doral, FI 33178 <br />Tel: 305.592.1070 <br />Fax: 305.592.1078 <br /> <br />~~~ <br /> <br />C H Perez 8. Associates <br />Englnoo,s' Plonnors' SUfvoyors <br /> <br />Professional Registration: <br />Florida Professional Engineer NO.4 7060 1993 <br />Education: <br />Bachelor of Science in Civil Engineering, Florida International University 1985 <br />Years of Experience: 24 <br />Project Specific Experience: <br />CH Perez & Associates, Inc October 2010 to Present <br />Senior Highway Engineer <br /> <br />Corzo Castella Carballo Thompson Salman Consulting Engineers Miami, Florida <br />August 2006 to September 2010 <br /> <br />USl / SR 5 / 18 Mile Stretch (FDOT 6), Miami-Dade County, FL 8/2006 to 10/2007 <br /> <br />Assistant Project Manager for reconstruction of an existing 2-lane undivided roadway to a 2-lane divided facility. <br />This corridor is part of the 18-mile stretch linking Florida City to the Florida Keys. The improvements include a <br />new 14-ft wide median with concrete barrier wall designed to eliminate head-on crashes. In addition, there is a <br />1-mile section where passing lanes are being provided. Coordination with utilities was very important as impacts <br />to the FKAA 36-in WM were to be avoided given the fact that this is the sole source water supply to all the <br />Florida Keys. In addition, we prepared JPA plans for the relocation of BST facilities. In addition, seven (7) <br />concrete box culverts were built to support wildlife crossings. Client PM: Jose Barrera, PE, 305.470.5260 <br /> <br />SR-50 from West of Hancock Rd to OCLi SR-50 from LCL to East of Turnpike Ramps, <br />Lake and Orange Counties, Orlando, Florida (FDOT 5) 6/2007 to 1/2009 <br /> <br />Assistant Project Manager for the plans update widening/reconstruction of SR-50 from a 4-lane <br />rural section to a 6-lane urban section that includes a 22-ft median, sidewalks, and bicycle lanes. <br />The construction cost for this project is estimated at $26 mil/ion. The Storm water system is <br />comprised of 7 closed basins including a joint use system with the Turnpike Enterprise. The <br />project includes a complex traffic control scheme that minimizes impacts to the ramps terminals <br />and toll facilities for the Turnpike Interchange in the town of Oakland. Extensive right-of-way <br />coordination, including acquisitions and easements, were required. Client PM: Jon Garner 386 <br />943-5539 <br /> <br />A&P Consulting Transportation Engineers Miami, Florida <br /> <br />June 2001 to November 2005 <br /> <br />MIC Terminal Access Roadways (MTAR) (FOOT 6) 11/2001 to 12/2004 <br /> <br />Assistant Project Manager in the development of Roadway Construction plans. The project is <br />located just east of the Miami International Airport and includes a new system of ramps to <br />connect the Rental Car Facility with Lejeune Northbound and Southbound and the Central <br />Blvd./Miami International Airport Interchange. MTAR, in conjunction with the Le Jeune Road <br />corridor project will facilitate a seamless connection between the MIA, RCF and future MIC Core <br />with SR-836 and proposed MDX Interconnector. Client PM: Gary Donn, PE 305.470.5881 <br /> <br />SW 8th Street Interchange Modifications at the Florida Turnpike (Florida Turnpike <br />Enterprises) 5/2004 to 11/2005 <br /> <br />Assistant Project Manager in the development of Construction Documents for a new southbound <br />HEFT exit ramp to westbound SW 8th Street in order to alleviate the mainline weave condition <br />that results from the heavy movement between the southbound HEFT entry from westbound SR- <br />836 traffic crossing the southbound HEFT existing to SW 8th Street. The proposed typical consists <br />of a single 15 feet lane ramp facility with 6 feet shoulders, 2 feet paved on the left and 4 feet <br />paved on the right. Client PM: Cheryl Doherty 407.532.3999 <br /> <br />Engineers 8t Surveyors dedicated to Transportation Development and Operations <br />