Laserfiche WebLink
<br />) <br /> <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />Francisco L. Nunez, PSM <br /> <br />Vice-President - Surveying Operations Manager <br />fln(dlp-i.1.u. <br /> <br />9594 NW 41" Street <br />Suite 201 <br />Doral, FI 33178 <br />Tel: 305.592.1070 <br />Fax: 305.592.1078 <br /> <br />~Q)~e 2004 <br />.~jJ, <br />C H Perez &. Associates <br />Engineors. Plnnner'. Survevofl <br /> <br />Professional Rel!istration: <br /> <br />Florida Professional Surveyor and Mapper No. 6382 <br /> <br />Education: <br />Engineering and Surveying Courses <br />High School Diploma, Miami Southwest High School <br />Seminars: <br />Advanced Geopak Coordinate Geometry, DTM, Geopak Survey and MicroStation J, FlU. <br />Advanced MicroStation Descartes, Texas Computer Graphics, Inc. <br />Advance CAiCE 2000 Processor, DTM and Design, AGA and Associates. <br />Section Corners Retracement, Bureau of Land Management (Walt Robillard) <br />Photogrammetry for Route Survey, Global Positioning System, Network Analysis. <br />Vector Processor for GPS, Cadastral Electronic Field Book, Electronic Field Book Processor. <br />EFB & CEFB Data Collection and Processor, Dr. Raymond J. Hintz, Ph.D. <br /> <br />Years of Experience: 30 <br /> <br />2002 <br /> <br />1978-1982 <br />1977 <br /> <br />Years of employment at C H Perez: 6 <br /> <br />Proiect Specific Experience: <br /> <br />251688-1-32-01: 1-395 Reconstruction from East of 1-95 to McArthur Causeway CHP-l10401 <br />This project includes Minor Design, Traffic Safety and Surveying and Mapping services required to replace the existing E-W <br />bridges in front of the Arsh Center with new signature bridges within the limits of the project. <br />. TYLlN, Inc. . FDOT District VI Consultant <br />Prrme Consultant: M' V II PE / (305)56 888 Client: Off' <br />anano a e, 7-1 Management Ice <br />Start Date: Jun-2011 Project Manager: Vilma Croft, PE <br />Completion Date: Dec-20B (305)470-5240 <br /> <br />GF 53842: West Avenue Bridge PD&E Project CHP-l10201 <br />This project includes Minor Design, Traffic Safety and Surveying and Mapping services required to provide a new bridge <br />within the limits of the project. <br />. Gannett Fleming, Inc. <br />Prrme Consultant: Jose Clavel, PE / (786)845-9540 Client: City of Miami Beach <br /> <br />Start Date: Apr-2011 Project Manager: <br />Completion Date: Dec-2011 <br /> <br />427023-1-32-01: SR-5/US-1 from PB/Martin Co Line MP 0.0 to MP 5.03 (Pavement Seam) CHP-102801 <br />The project consists of milling and resurfacing SR 5/US 1, sidewalk implementation, minor drainage improvements, <br />pedestrian count down, landscaping, signing and pavement marking. CHPerez responsible for Surveying. <br />. AECOM . FDOT District IV Consultant <br />Prrme Consultant: B F" PE / (813)630 2500 Client: M Off' <br />runo lon, - anagement Ice <br />Start Date: Apr-2011 Project Manager: Fernando Morales, PE <br />Completion Date: Aug-2011 (954)777-4241 <br /> <br />Districtwide Surveying Consultant CHP-102601 <br />This project includes Surveying and mapping Services for projects produced by the internal design section of the district as <br />well as any other necessary survey required by the Department. <br /> <br />Prime Consultant: CH Perez & Associates Consulting Engineers, Inc. <br /> <br />Start Date: Dec-2010 <br />Completion Date: Nov-2014 <br /> <br />I. FOOT District IV <br />C lent: S . Off' <br />urveYlng Ice <br /> <br />Project Manager: Robert Hughan, Jr., PSM <br /> <br />(954)777-4556 <br /> <br />Engineers & Surveyors dedicated to Transportation Development and Operations <br /> <br />m:\Ior\dty 01 sunny isles drianage imrprollements\resumes\!1nunez.resume.lpg. lOll.doc <br /> <br />Page 1 of 1 <br />