Laserfiche WebLink
<br />) <br />) <br />) <br />) <br />) <br /> <br /> <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />EXPEFlTISE <br /> <br />Sill Vf'\:ll1g <br /> <br />SuiJsulllI' 1IIIIIly <br /> <br />tligl11 " ! ''is ,lJF) <br /> <br />Utilll, LO()ldl!lrltIOII <br /> <br />EXPEF\lnXT <br />Will1fHI\ l')'{p.cHs <br />vVtth lltllF'lsl '{eals <br /> <br />EMPLOYMENT <br />Joilll~(1 n~i\ Ilf/'1996 <br /> <br />EDUC!\ 1'10[\] <br />B A. <br /> <br />Llhe,al (\Il~ <br />Olel W.'st I)lli\. j\J'{ <br /> <br />(J98f)) <br /> <br />~~.ALEMAN <br />& Associates, Inc. <br />CONSULTING ENGINEERS & SURVEYORS <br /> <br />DENNIS STANTON <br /> <br />Subsurface Utility Engineering Director <br /> <br />Mr. Stanton has specialized in utility coordinating, mapping and protection of subsurface <br />utility systems for nearly 16 years. He has relevant and recent work experience in <br />designating, locating and plant protection projects. He has performed utility investigations <br />with a variety of electronic detection devices, survey equipment and air/vacuum <br />excavators on numerous projects throughout Florida, New York, Virginia and Maryland. He <br />has supervised over 10,000 test holes and over 1,000,000 utility feet of designating. <br /> <br />PROJECT EXPERIENCE <br /> <br />Districtwide Utility Coordination Services, FOOT 6 (2006 - Present). Mr. Stanton provides <br />Utility Coordination services for this project. FRA has completed numerous major roadway <br />projects under this contract and also provides on-site services as needed. Tasks have <br />included all phases of utility negotiations, relocation and cost estimates all the way <br />through to construction. Contact: Mr. Tony Soto (305) 470,5232 <br /> <br />1-595 Corridor Roadway Improvements, FOOT 4 (04/2009 - Present). FRA serves as a <br />subconsultant to the ACS Dragados/EarthTech Team for this project. The area of this <br />project extend from the 1-75/Sawgrass Expressway interchange to the 1-595/1-95 <br />interchange in central Broward County, Florida, for a total project length of approximately <br />10.5 miles. The project consists of the reconstruction, addition of auxiliary lanes and <br />resurfacing of the 1,595 mainline (including associated improvements to frontage roads <br />and ramps), and a new reversible express lanes system in the 1-595 median. Under Mr. <br />Stanton's direction, FRA is providing SUE services to support the design and construction <br />for approximately 15.5 miles of the interstate highway system. FRA provides designation <br />of all requested underground utilities by means of electromagnetic and ground <br />penetrating radar (GRP). In addition, we are providing utility locations using the vacuum <br />excavation method for approximately 1500 possible utility conflicts. Our in-house <br />surveying group is providing the necessary survey support so we may deliver a stand alone <br />product certified by a professional Surveyor. Contact: Mr. Dong Chen (954) 777- 4362 <br /> <br />Districtwide Utility Location Services & D/W Underground Utility Services Contract, FOOT <br />4 (11/2000 - Present). Mr. Stanton, as the Project Manager, provides all the necessary <br />services to designate, locate by excavation, survey and map existing surface and <br />subsurface utilities to support the design of construction plans on projects selected by the <br />Department. He provides exact horizontal and vertical locations of existing underground <br />utilities by way of electromagnetic, sonic and other geophysical location techniques <br />including vacuum excavation. FRA has been awarded two consecutive contracts! Contact: <br />Mr. Ken Olson (954) 777,4563/ Mr. Bob Hughan (954) 777-4558 <br /> <br />Districtwide Utility Negotiations/Coordination, FOOT 4 (5/2004 - Present). Mr. Stanton <br />provides Utility Coordination services for this contract; FRA has successfully completed <br />over 10 major utility coordination assignments for the Department. He also reviews plans <br />for the District using information collected during field visits and meetings with pertinent <br />utilities. The goal is to ensure all potential conflicts are located/resolved and the final <br />plans reflect the identified information properly before the start of construction. Contact: <br />Ms. Anne Endsley (954) 777,4128/ Mr. Gary Keife, P.E. (954) 777,4684 <br /> <br />Districtwide Subsurface Utility Engineering, FOOT 7 (2 Consecutive Contracts: 8/2001 - <br />8/2006 & 7/2006 - Present). Mr. Stanton, as the Project Manager, provides all the <br />necessary services to designate, locate by excavation, survey and map existing surface <br />and subsurface utilities to support the design of construction plans on projects selected by <br />the Department. He provides exact horizontal and vertical locations of existing <br />underground utilities by way of electromagnetic, sonic and other geophysical location <br />techniques including vacuum excavation. Contact: Mr. John Kubler No Longer with FOOT <br />/ Ms. Darling Calender (813) 975,6146 <br /> <br />Districtwide Utility Location Services, FOOT 6 (8/1999 - 12/2005). Mr. Stanton, as the <br />Project Manager, facilitated a quick response to the Department when ordering <br />subsurface exploration services. He provided all the necessary services to designate, <br />locate by excavation, survey and map existing surface and subsurface utilities to support <br />the design of construction plans on projects selected by the Department. He provided <br />exact horizontal and vertical locations of existing underground utilities by way of <br />electromagnetic, sonic and other geophysical location techniques including vacuum <br />excavation. Contact: Mr. Tony Soto (305) 470-5232 <br />